CFT GmbH Compact Filter Technic
CFT GmbH Compact Filter Technic
DSI Underground GmbH
CFT GmbH Compact Filter Technic
DSI Underground GmbH
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
11. Kolloquium Fördertechnik im Bergbau - 2024

English Deutsch News-Archive
News - Mining, Tunnelling, Geotechnics, Energy

05.10.2021 (461 Clicks)

SSAB appoints Leena Craelius as acting CFO

Leena Craelius has been appointed acting CFO at SSAB. She has long experience of the steel industry and has held several senior positions at SSAB. She will take up her new position on November 1, 2021.

 

>> Read More >>

04.10.2021 (548 Clicks)

Tunnel Progress as HS2 completes first Mile under the Chilterns

The first enormous 2,000 tonne tunnelling machine passed the one mile mark this week during the construction of the first tunnels for HS2 - Britain’s new high speed rail link between London, Birmingham and the north.

 

>> Read More >>

04.10.2021 (364 Clicks)

QRC supports MCA’s Statement on Net Zero Emissions by 2050

The Queensland Resources Council (QRC) supports the statement by the Mineral Council of Australia regarding the industry’s ambition to achieve net zero emissions by 2050.

 

>> Read More >>

04.10.2021 (386 Clicks)

Metso Outotec to deliver a large Number of high-capacity Slurry Pumps for Tailings Treatment in Ukraine

Engineering Dobersek in Germany and Severniy Mining and Processing (SevGOK) in Ukraine have selected Metso Outotec’s mill discharge pumps for Severniy’s greenfield process waste thickening plant.

 

>> Read More >>

04.10.2021 (438 Clicks)

Birmingham Spinout Salinity Solutions enters Lithium ‘Gold Rush’

A new University of Birmingham spinout, Salinity Solutions, is partnering with the mineral exploration and mining industry with a compact, energy-efficient desalination system that can concentrate the salts in ground water to extract a mineral rich brine.

 

>> Read More >>

01.10.2021 (402 Clicks)

CityFibre expands strategic Alliance with Bechtel to support continued Acceleration of its Rollout

Bechtel partnership extended after supporting a huge ramp up in CityFibre’s UK-wide Full Fibre rollout in the last 12 months

 

>> Read More >>

01.10.2021 (468 Clicks)

Genoa Model narrated in the immersive Multimedia Room

“We are emerging from an epochal economic crisis. Italy needs tangible, immediate measures to create jobs and employment, which are key sustainability issues that all of Europe needs now. Businesses play a central role in defining the industrial model required to initiate a lasting, shared recovery, in this unique economic moment. The Genoa Bridge experience has shown us how.

 

>> Read More >>

30.09.2021 (411 Clicks)

Zyter collaborates with Zurich North America, Qualcomm and Everguard to enhance Construction Safety

Pilot started at Rudolph Libbe Group Construction Site, with Insurance Provider Zurich North America evaluating impact for potential use with other customers

 

>> Read More >>

30.09.2021 (361 Clicks)

Implenia back at the Gotthard – Ground-breaking Ceremony for the second Tube of the Gotthard Road Tunnel


Ceremony by the Swiss Federal Roads Office (FEDRO) to mark the ground-breaking for the second tube of the Gotthard road tunnel. Implenia is significantly involved in two lots. The complex tunnel and civil engineering works have already started.

At the invitation of FEDRO, the ground-breaking ceremony for the construction of the second tube of the Gotthard road tunnel took place at two ceremonies in Göschenen and Airolo. A few months ago, Implenia was awarded the contracts for the two preparatory lots 'Relocation of the north safety tunnel' and 'North access shaft and logistics excavations' and has started the complex tunnelling and civil engineering work.

In November 2020, Implenia was awarded the contract for the first lot of the preparatory work, the relocation of the north safety tunnel (Lot 242), worth CHF 12.6 million, with a project duration of two years.

The second lot (Lot 243) consists of the access shaft to provide access to the 'northern disruption zone' and the logistics excavations to accommodate an underground concrete plant. This lot, with a total volume of CHF 86.6 million and a planned construction period of around 2.5 years, was awarded to the 'secondo tubo' joint venture led by Implenia in March 2021. Implenia has a 40% share in the joint venture, the partners Webuild Group/csc another 40% and Frutiger 20%. Construction started last spring.

The allocation of the preparatory lots for the second tube of the Gotthard road tunnel preceded the publication of the invitation to tender for the two large main lots by several months. The bids for the two main lots north and south will be submitted in November of this year. The contracts are expected to be awarded in the second quarter of 2022. Between 2001 and 2014, Implenia played a major role in the construction of the Gotthard Base Tunnel for the railway, a contract worth CHF 2.84 billion in total.

André Wyss, CEO of Implenia, on the ground-breaking ceremony: 'Implenia is back at the Gotthard. The second tube of the road tunnel is a key infrastructure project for Switzerland and Europe. We are delighted that we are once again able to apply our many years of experience and proven expertise in managing large and complex infrastructure projects at the Gotthard.'

Source: Implenia



Implenia, Switzerland, tunnelling, Gotthard, road, tube, second, wyss, start, webuild, civil engineering, lot, 243, 242

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

30.09.2021 (394 Clicks)

SMT Scharf AG receives Final Approval for China III Machines and raises Guidance for FY 2021

SMT Scharf AG announces that it has received final approval for China III machines from the Chinese regulator.

 

>> Read More >>
F. Willich GmbH + Co. KG

Zur Verstärkung unseres Teams suchen wir, entsprechend für den Bereich Einkauf,   einen Operativen Einkäufer (m/w/d)
Latest Articles

03.11.2023 

Inspections of Flexible Protection Systems against Natural Hazards – Using and passing on Special KnowledgeInspections of Flexible Protection Systems against Natural Hazards – Using and passing on Special Knowledge

Inspections of flexible protection systems against natural hazards are becoming increasingly important. Geobrugg passes on its knowledge in socalled CONSIS courses to keep the function of structures...  

11.07.2023 

Storage Reservoir for a Hydroelectric Power Plant in the Alps - Rock Processing under the toughest ConditionsStorage Reservoir for a Hydroelectric Power Plant in the Alps - Rock Processing under the toughest Conditions

During a comprehensive refurbishment and modernization project the hydroelectric power plant of the Sellrein-Silz power plant expands with a reservoir. The plant technology of rock processing repres...  

11.07.2023 

Game Tip – Go Goals!Game Tip – Go Goals!

The United Nations have created the “Go Goals!” game for children. You can help to achieve the 17 Sustainable Development Goals (SDGs) and are invited to use the game in your environment...  

IVGeobaustoffe, Geokunststoffe, Wasserbau, Straßenbau, Verkehrswegebau, Straßenoberbau, Asphalteinlagen, Erd- und Grundarbeiten, Umwelttechnik, Deponiebau, Eisenbahnbau, Geotextil
Geobrugg AG - Safety is our Nature
Rudolf von Scheven GmbH
Deutsches Medikamenten Hilfswerk action medeor e. V. Die Notapotheke der Welt
Deutsches Medikamenten Hilfswerk action medeor e. V. Die Notapotheke der Welt
SMT Scharf GmbH
Deutsches Medikamenten Hilfswerk action medeor e. V. Die Notapotheke der Welt
SMT Scharf GmbH
URETEK Deutschland GmbH
moduscom unternehmenskommunikation - die etwas andere Art der Werbe-Dienstleistung
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (1985 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

read more

Books / Bücher
RAG-Technikchronik - Buch 1: Technikentwicklung und Forschung der RAG

RAG-Technikchronik - Buch 1: Technikentwicklung und Forschung der RAG

27. December 2019 (13168 Clicks)

Das Buch 1 "Technikentwicklung und Forschung der RAG" behandelt zusammenfassend die Ergebnisse der Bücher 2 bis 6 und ergänzt um das Thema Lagerstätte aus dem Buch 7. Das Thema „Forschung und Entwicklung“ wird genauso behandelt, wie der Streckenausbau, die Entwicklung der Technikbereiche, die Bergwerksautomatisierung und die Unternehmensdigitalisierung.  

read more

Seetech GmbH
Seetech GmbH
Fluid Competence GmbH
Seetech GmbH
Fluid Competence GmbH
HUESKER Synthetic GmbH
MiningForum 2024 - The international mining hub - for a sustainable future - 6-7 June 2024 - Berlin, Germany, Estrel

Trend News
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine

27.11.2023 (511 Clicks)

Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine


read more - Akobo-Minerals-celebrates-historic-milestone-hitting-gold-ore-body-at-the-Segele-Mine

Trend News
Trend News
70th anniversary: REMA TIP TOP of North America celebrates success story

24.11.2023 (135 Clicks)

70th anniversary: REMA TIP TOP of North America celebrates success story


read more - 70th-anniversary-REMA-TIP-TOP-of-North-America-celebrates-success-story

Trend News