English Deutsch News-Archive
GeoResources

12.10.2021 (352 Clicks)

IWiM successfully delivers Fourth Consecutive International Women in Resources Mentoring Programme (IWRMP)

International Women in Mining (IWiM) is proud to announce the success of its 2021 International Women in Resources Mentoring Programme (IWRMP). The virtual closing ceremony was held on 5 October 2021 and was attended by over 130 participants worldwide. These included mentees, mentors and representatives of sponsor organisations who used the occasion to celebrate the positive impact that the programme has had on their careers and organisations.

 

>> Read More >>

12.10.2021 (329 Clicks)

Gladstone Gem to expand World’s Hydrogen Production

The Queensland Resources Council (QRC) has welcomed the addition of a new asset for Queensland’s diverse resources and energy sector, with the announcement of plans for one of the world's largest hydrogen-equipment manufacturing facilities in Gladstone, in partnership between the Queensland Government and Fortescue Future Industries (FFI).

 

>> Read More >>

11.10.2021 (387 Clicks)

QRC welcomes Senex Decarbonisation Action Plan

The Queensland Resources Council (QRC) has welcomed the released of Senex Energy’s Decarbonisation Action Plan and its company ambition to reduce greenhouse gas emissions across its operational footprint to net zero by 2040.

 

>> Read More >>

09.10.2021 (352 Clicks)

New Prevention against Concrete Spalling on Segments in Tunnels

It is generally known that the design of segments tends to become thinner and thinner due to cost, handling and environmental aspects. As a result the contact area between the segment has to be increased as much as possible, which will lead in turn reducing the distance for the gasket to the edge of the segment.

 

>> Read More >>

08.10.2021 (335 Clicks)

Government applauded for Engineering Futures

A new program to encourage people into engineering careers has been welcomed by the Queensland Resources Council (QRC).

 

>> Read More >>

08.10.2021 (358 Clicks)

Akobo Minerals signs Contract with Midroc for a second core-drilling Rig – significantly expanding Production Capacity

Akobo Minerals will soon be working with a total of three core drilling rigs in field, including one company owned drill rig. The experience and performance with the first drill rig from Midroc Geo/Exploration Services PLC (“Midroc”) has met expectations hence a contract amendment has been signed for a second drill rig to be engaged.

 

>> Read More >>

07.10.2021 (425 Clicks)

Epiroc to acquire Specialist in Mining Vehicle Battery Conversions

Epiroc, a leading productivity and sustainability partner for the mining and infrastructure industries, has agreed to acquire the business and assets of FVT Research Inc., a Canadian company with expertise in converting diesel-powered mining machines to battery-electric vehicles.

 

>> Read More >>

07.10.2021 (502 Clicks)

Bauer Spezialtiefbau involved in Construction of the LVR Building in Cologne-Deutz in Germany


After demolition of the existing building, a new administration building will be constructed on Otto square in Cologne’s Deutz district to house the central administration of the “Landschaftsverband Rheinland” association (LVR) on a total area of 7,357 m². Bauer Spezialtiefbau GmbH was engaged by the LVR with construction of the excavation pit.

 

Work includes the construction of an excavation pit up to 8 m deep comprising a contiguous pile wall with wood and shotcrete paneling in the north as well as a secant pile wall in the west. In the east and south, the encompassment of the excavation pit is provided by existing walls of the underground garage. The retaining structure works are being carried out at the same time as demolition of the existing building.

The secant pile wall is being constructed on the temporarily supported ceilings of the basement floors. The piles have a diameter of 750 mm and 880 mm. “The tie back work, including walings for existing walls of the underground garage, is very labor-intensive. And archaeological digs in the course of excavation work in the northern area of the excavation are also anticipated,” says Bauer Project Manager Andreas Hertenberger. Further, the underground garage walls are underpinned with DSV bodies. In the southwest area of the excavation pit, pipe bracing with lengths of up to 30 m are installed. Bauer’s tasks also include the construction of wells and the dewatering system. For the latter, an approximately 500 m long drainage pipe to the Rhein river was installed that transports water at a rate of 4,800 m³/h.

A Bauer BG 24 H is in use as well as a Klemm KR 704, KR 702 and a KR 806 rig for the anchor drilling work. Work began in early April this year and the completion of the entire new building, with a height of 69.5 m and 17 stories, 182 parking spaces for cars and 208 parking spaces for bicycles, is planned for August 2022.

Source: Bauer Group



Bauer, Germany, Geotechnics, specialist foundation, engineering, BG 24 H, KR 704, KR 701, KR 806, rig, drilling, pit, excavation, Andreas Hertenberger, pile, shotcrete

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

06.10.2021 (362 Clicks)

Endomines AB reports Appointment of interim CEO

Endomines AB started the recruitment for a permanent CEO in the summer 2021 after Marcus Ahlström, Interim CEO and CFO of the company had informed the Board that he will be stepping down in October.

The recruitment process has proceeded very well and as planned. The company anticipates being able to appoint the new permanent CEO in the beginning of 2022.

 

>> Read More >>

06.10.2021 (463 Clicks)

Boliden: Environmental Permit for expanded Production in Garpenberg granted

Boliden has been granted an environmental permit for an increase in the annual production rate in Garpenberg. As a result of the decision, bottleneck investments can be initiated with the aim of increasing production to 3.3 Mtons per year.  

 

>> Read More >>
J. D. Theile GmbH & Co. KG
Latest Articles

20.10.2022 

How a Generation Change can succeedHow a Generation Change can succeed

The BEUMER Group has had a new CEO since June 1, 2022. The previous and the new CEO explain how a generation change like this can succeed....  

#BEUMER Group GmbH #Mining #Tunnelling #underground mining #surface mining, quarrying #Conveyor technology

20.10.2022 

Hybrid Grouting – an innovative TechnologyHybrid Grouting – an innovative Technology

Standard grouting equipment is limited to cement-based or organic grouting. Recent developments in grouting technology allow cement-based or organic grouting on a single mobile grouting platform....  

#Häny AG #Hochtief AG #Tunnelling #Mining #Geotechnics #injection technology

20.10.2022 

How an IIoT Solution for Mining Machines can be successfully introduced into a Quarry OperationHow an IIoT Solution for Mining Machines can be successfully introduced into a Quarry Operation

Many mining companies still do not know whether they are ready to implement IIot projects for mobile mining machines – and things often stay this way until they try out digitalisation for themselves in an in-house pilot project. Sometimes it is enough simply to go for it and learn from the experience. But what is actually possible and how can ‘digital transformation’ be applied in-house? The conditions and measures needed for such a successful digital transformation are outlined below from the perspective of a tech company that supplies hardware and software solutions and also supports clients through the introduction and implementation process....  

#talpasolutions GmbH #Mining #underground mining #Machinery for Mining and Construction #Digitalisation services #Big Data analytics

URETEK Deutschland GmbH
IVGeobaustoffe, Geokunststoffe, Wasserbau, Straßenbau, Verkehrswegebau, Straßenoberbau, Asphalteinlagen, Erd- und Grundarbeiten, Umwelttechnik, Deponiebau, Eisenbahnbau, Geotextil
EXPROTEC GmbH
HUESKER Synthetic GmbH
HUESKER Synthetic GmbH
FAB
HUESKER Synthetic GmbH
FAB
Geobrugg AG
SMT Scharf GmbH
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (380 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

#Brennero Tunnel Construction (BTC) #HOSCH-Foerdertechnik Recklinghausen GmbH #Tunnelling #Traffic tunnels #Conveyor technology #Digitisation

>> read more >>
Books / Bücher

Liederverzeichnis des Liederbuchs für Berg- und Hüttenleute

05. October 2022 (549 Clicks)

 

#Tunnelling #Mining

>> read more >>
Most clicked News

13.04.2022 (645 Clicks)

Skanska signs Contract for Work at Wastewater Resource Recovery Facility in NY, USA

Skanska has, as part of a joint venture with R.J. Industries, Inc., signed a ...  

#Skanska #Geotechnics #Supply tunnels #concrete #in-situ concrete #ventilation, dust extraction

>> read more >>
Most clicked News
Microtunnel Boring Machine breaks new Ground with mineral oil-free hydraulic Fluids from German Specialists

25.03.2022 (602 Clicks)

Microtunnel Boring Machine breaks new Ground with mineral oil-free hydraulic Fluids from German Specialists

The Saarbrücken civil engineering contractor SaarGrundbau has successful...  

#SaarGrundbau GmbH & Co. KG #Herrenknecht AG #Fluid Competence GmbH #Tunnelling #Supply tunnels #Hydraulics

>> read more >>
Most clicked News

23.05.2022 (587 Clicks)

Metso Outotec wins Order for large Iron Ore Pellet Plant in Oman

Metso Outotec has signed an agreement for the delivery of engineering and key...  

#Metso Outotec #Vulcan Engineering Co. #processing

>> read more >>
Most clicked News

09.06.2022 (569 Clicks)

Femern A S and SICE-COBRA sign multi-billion Contract

On Monday 30 May, Femern A/S and SICE-COBRA have signed the contract for the ...  

#Sociedad Ibérica de Construcciones Eléctricas (SICE) #Cobra Instalaciones y Servicios (Grupo Cobra) #Femern A/S #Tunnelling #Traffic tunnels

>> read more >>