23.11.2021 (386 Clicks)
Sika expands its Production Capacity in China for faster and more sustainable Customer Solutions
By opening a new mortar production facility in Jiaxing City, in the province of Zhejiang in Eastern China, Sika has further expanded its production capacity in the rapidly growing Chinese construction market.
>> Read More >>
22.11.2021 (375 Clicks)
Staffs’ Wardell Armstrong welcome HS2 CEO to see progress on route between West Midlands and Crewe
Multidisciplinary environmental, engineering and mining consultancy, Wardell Armstrong, has welcomed Mark Thurston - HS2 Ltd's CEO - to a worksite where a team of environmental specialists are working on the early works phase of HS2 construction.
22.11.2021 (413 Clicks)
BHP and Woodside agree to create a global Energy Company
BHP Group (BHP) and Woodside Petroleum Ltd (Woodside) have today signed a binding share sale agreement (SSA) for the merger of BHP’s oil and gas portfolio with Woodside (Merger). Woodside will acquire the entire share capital of BHP Petroleum International Pty Ltd (BHP Petroleum) in exchange for new Woodside shares.
>> Read More >>
19.11.2021 (369 Clicks)
B.C., Canada: Provincial State of Emergency declared
The B.C. government has declared a provincial state of emergency to mitigate impacts on transportation networks and movement of essential goods and supplies, and to support the provincewide response and recovery from the widespread damage caused by severe flooding and landslides in British Columbia.
>> Read More >>
19.11.2021 (381 Clicks)
Fugro to update Cayman Islands Fydrography for UKHO with carbon-neutral Survey
The UK Hydrographic Office (UKHO) has selected Fugro to survey a 515 km2 area over the Cayman Islands in November.
>> Read More >>
19.11.2021 (363 Clicks)
Webuild wins Lot H41 Gola del Sill-Pfons on austrian Side of Brenner Base Tunnel
New lot brings to four the lots under construction by Webuild on world’s longest railway tunnel of 55km
The Webuild Group and its Swiss subsidiary CSC have won Lot H41 Gola del Sill-Pfons of the Brenner Base Tunnel project for a value of €651 million. The Group has a 50% stake in the joint-venture with Swiss partner Implenia (50%). The joint-venture was awarded the contract by BBT SE, a European public limited company created for the development of the railway tunnel between Italy and Austria under the Alps.
The lot, which will employ 400 workers directly, increases Webuild’s involvement in the development of the Brenner Base Tunnel, which will become the longest railway tunnel in the world at 55 km, one of the most complex projects given the mountainous terrain, thereby confirming the Group’s expertise in tunnelling with a track record of approximately 2,400 km of underground work. Webuild is working on other lots of the Brenner Base Tunnel, including the Isarco River Underpass and the Mules 2-3 lot after having completed Lot Tulfes-Pfons for BBT. Webuild is also working on the railway between Fortezza and Ponte Gardena south of the tunnel in the mountain.
The newly awarded Lot H41 foresees a section of the Brenner Base Tunnel in Austria and consists in the construction of the railway from Gola del Sill near the city of Innsbruck in the north to the town of Pfons located further south. The contract includes both the traditional method of excavation for the two parallel tunnels for approximately 7.3 km, including auxiliary tunnels as well as the mechanised method of excavation for another 16.5 km, in addition to the lining of the walls of completed tunnels, an underground emergency stop at Innsbruck, access tunnels, exploratory tunnels and parts of other secondary tunnels.
The mechanised method will deploy two tunnel-boring machines (TBMs), among the most sophisticated in the sector, with a diameter of more than 10 m. The design of the project focuses on the environmental sustainability of the project during construction: the logistics of the work sites are designed to reduce travel times for the transport of materials, and measures to reduce dust and noise are foreseen.
The Brenner Base Tunnel will be crucial for Europe. It will be a key part of the Scandinavian-Mediterranean Corridor of the Trans-European Transport Network (TEN-T) that will connect Helsinki in Finland and La Valletta in Malta. It also plays an important role in connecting Italy and Austria with a high-speed/high-capacity railway. Webuild is a global leader in infrastructure for sustainable mobility. In Italy, it is working on some of the most important projects in transport, including the high-speed railways between Naples and Bari in southern Italy and Verona and Padua in the north. It is also building the Terzo Valico dei Giovi-Nodo di Genova between Milan and Genoa.
Source: Webuild Group
Webuild, CSC, Implenia, BBT SE, Austria, new order, tunnelling, brenner base, tunnel, Lot H41, TEN-T, joint-venture, railway







18.11.2021 (366 Clicks)
Demand for Raw Materials boosts Mining
Mining machinery manufacturers from Germany are also benefiting from the increasing demand for raw materials. They supply cutting-edge technology for a climate-neutral future.
>> Read More >>
18.11.2021 (458 Clicks)
Metso Outotec wins major Order for Iron Ore Pellet Plant Capacity Expansion in Ukraine
Metso Outotec has signed an agreement for the delivery of key equipment for the expansion of an existing production line at the Ferrexpo Poltava Mining iron ore grate-kiln pellet plant, which is located in the mining city of Horishni Plavni in central Ukraine.
>> Read More >>
18.11.2021 (350 Clicks)
Evolution Mining to acquire Ernest Henry Mining from Glencore
Glencore and Evolution Mining Limited (Evolution) have entered into a binding agreement for the sale and purchase of Glencore’s 100% interest in Ernest Henry Mining Pty Ltd, the owner of the Ernest Henry Mining (EHM) copper-gold mine in Queensland, Australia.
>> Read More >>
18.11.2021 (369 Clicks)
Skanska is expanding the Stockholm Metro in Nacka, Sweden
Skanska has signed a contract with The Stockholm Regional Council to build a new stage of Stockholm’s metro in Nacka, Sweden. The contract is worth about SEK 1.2 billion which will be included in the Nordic order bookings for the fourth quarter of 2021.
nacka station
>> Read More >>
11.07.2023
Dare to recycle more!
Increased recycling of critical metals such as tungsten can make raw material supplies more secure and sustainable worldwide. To achieve this, closed value cycles should be established. Achieving th...
11.07.2023
Mongolia – a Partner to secure German Needs for Raw Materials
Mongolia is one of the most resource-rich countries in the world. A lighthouse project in line with the commodity agreement between the German and Mongolian governments is the German-Mongolian Insti...
06.04.2023
Focus on Nature and Climate – a Turning Point and constructive Cooperation
A close connection with nature and respectful interaction despite diversity are important keys for a turning point in climate protection.
...
02.10.2023 - 04.10.2023
AFTES International Congress 2023
04.10.2023 - 05.10.2023
ESG Africa Conference 2023
08.10.2023 - 13.10.2023
International Snow Science Workshop ISSW 2023
09.10.2023 - 14.10.2023
15th ISRM Congress 2023

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1692 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 5: Technikentwicklung in der Grubensicherheit - Band I
27. September 2018 (10548 Clicks)
Das Buch 5 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklungen der vergangenen fünf Jahrzehnte aus dem Bereich Grubensicherheit dar. Der erste Band beschäftigt sich mit den Themen Bewetterung, Klimatisierung, Gasbeherrschung, Wetterüberwachung, Gasausbruchs- und Gebirgsschlagverhütung.


04.09.2023 (144 Clicks)
Herrenknecht announces final breakthrough for Silvertown Tunnel
Tunnelling at the Silvertown project in London on track for success: using th...


19.09.2023 (129 Clicks)
Cimic´s CPB Contractors selected as preferred bidder for Victoria’s Suburban Rail Loop East
Cimic Group’s CPB Contractors has been selected by the Victorian Govern...

06.09.2023 (119 Clicks)
Harmony - Loss-of-life incident at Kusasalethu mine
Harmony Gold Mining Company Limited regrets to announce that two employees tr...


04.09.2023 (111 Clicks)
steute Technologies restructures its business fields
steute Technologies, an international technology company for top-quality swit...
