English Deutsch News-Archive
GeoResources - Mining, Tunnelling, Geotechnics, Energy - News, Events and Journal

01.02.2022 (283 Clicks)

Mining Company in Pskov Region upgrades Production with CDE Solution


Wet processing solution ensures stable supply of GOST-compliant products

Real LLC, one of the leading suppliers of construction materials in the Pskov region, has announced plans to introduce a new wet processing solution to its operation in Velikiye Luki which will modernise production and increase its supply of GOST-compliant products.

In the Pskov region, the company carries out the production of sand and aggregates – products which supply its own concrete plant and are also sold directly to the local construction industry. Real LLC is also involved in the repair, construction and maintenance of public roads throughout the region.

With a number of traditional crushing and screening plants in place, Real LLC felt the need for a more robust solution to increase the supply of sand and aggregates complying with the market requirements and regulations as defined by the Russian state standard GOST.

In response, CDE proposed a 150tph (tonnes per hour) integrated solution comprising its M2500, AquaCycleTM and Aqua Store.

When commissioned, it will be used for the processing of crushed rock and a sand/gravel mixture containing up to 80% sand to produce a range of in-spec sand and aggregates including 4-20mm and +20mm crushed stone as well as 0-1mm and 0-4mm sands.

Ilya Bochkarev, CDE’s business development manager for the Russian market, says addressing the underlying issues concerning the consistency of product output will in turn boost capacity and revenue.

“A more modern solution will enable Real LLC to improve the quality of its product range and continue to occupy its current market position. The existing crushing and dry screening methods employed can produce in-spec products, but it’s ensuring that the outputs remain consistent where such processes fall short. Currently, not all products meet the high expectations required by both Real LLC and its customers. Similarly, not all comply with Russian GOST certification.

“Our solution will equip Real LLC with the technology it requires to produce premium products in accordance with the national standards required of construction materials. And by ensuring consistency in those products, the company will be able to maintain high throughput and an output that commands the highest commercial value,” Mr Bochkarev adds.

Vitaly Zakharenko, deputy director at Real LLC, says the new plant designed and engineered by CDE will underpin the future growth of the company.

“This new project represents both our first working in partnership with the expert team at CDE and also our first foray into the wet processing of sand and aggregates. Historically, we have crushed and dry screened our products, a process that has served us well over the past two decades and facilitated tremendous growth, supporting us to maintain our leading position in the local market.

“However, to provide further development and growth and to ensure we continue meeting the high expectations of the industry, we need to transform how we operate and guarantee consistency across our product range – an endeavour we feel equipped to accomplish with the support of CDE’s technological solution.”

Representatives from the company were invited to a similar CDE reference site in the Vologda region where they had the opportunity to see the company’s wet processing technologies in action, processing similar grade materials.

“Seeing the plant in operation provided the reassurance we needed that CDE understood our aims and that the solution proposed would deliver for us. It reaffirmed the benefits that could be reaped by adopting new ways of working with more modern technological processes,” Mr Zakharenko adds.

The CDE solution will enable Real LLC to respond to growing demand in the short-term while also equipping it with a plant that can grow alongside the company, as Mr Bochkarev explains.

“Modularity is central to the design and engineering of all CDE technologies. It ensures the adaptability and flexibility for the solution so that it can be scaled up in line with the customer’s business as it responds to changes in the market.

“Like all CDE solutions, Real LLC also benefit from our modular approach, meaning the capacity of the plant can be up-scaled in the future with additional CDE modules that will integrate seamlessly into the operation.”

CDE is expected to commission the new plant in Velikiye Luki in spring 2022.

Source: CDE



Mining, CDE, Russia, Real, crushing, construction material, Pskov, sand, aggregates, wet processing, Velikiye Luki, concrete, Ilya bochkarev, Vitaly Zakharenko, modularity,

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

31.01.2022 (242 Clicks)

RF SAMPO Project strengthens Finland's Competitiveness in Radio Technologies

A consortium of major industrial and academic stakeholders led by Nokia and coordinated by the University of Oulu will start a massive project aiming to speed up the development of RF and antenna technologies and accelerate the transition from 5G to 6G. Through technological development, the project contributes to the creation of new jobs and new business opportunities.

 

>> Read More >>

28.01.2022 (266 Clicks)

Acquisition: Rema Tip Top strengthens its Market Position in Brazil

Rema Tip Top AG acquires Tecnolita Industrial Ltda., a manufacturer and supplier of high-performance refractories and anti-corrosion materials and systems located in Campinas, Brazil. With this acquisition, Rema Tip Top further expands its strategic presence in Latin America.

 

>> Read More >>

28.01.2022 (295 Clicks)

Hochtief to deliver Power Supply Tunnel Project in Wales

Hochtief UK has been awarded a GBP 207 million (EUR 240 million) power supply tunnel project by National Grid in Wales. The project is part of the Visual Impact Provision project in the Snowdonia National Park near Porthmadog in the north of the country.

 

>> Read More >>

27.01.2022 (677 Clicks)

Water: ILF as PMC for „The Green Riyadh Project” (KSA)

The Royal Commission for Riyadh City in Saudi Arabia (RCRC) selected ILF as the Project Management Consultant (PMC) for the 1,700,000 m³/day TSE transmission network.

 

>> Read More >>

27.01.2022 (287 Clicks)

HS2 awards Station Lifts and Escalators Framework to TK Elevator

HS2 Ltd confirmed that TK Elevator has been awarded the framework to deliver around 300 state-of-the-art lifts and escalators for the four major new stations being built as part of the HS2 high speed rail project.

 

>> Read More >>

27.01.2022 (354 Clicks)

A Product Range for Customer Applications from National Pile Cropper

From its base in the heart of England, National Pile Cropper (NPC) has gone from strength to strength developing and supplying its own line of patented customer focused pile cropping solutions to a wide array of customers.  These range from multinationals working on HS2 and specialist piling companies, to regional contractors and local ground workers. As part of its market leading R&D programme, the company has announced a plethora of customer focused developments for 2022.

 

>> Read More >>

26.01.2022 (297 Clicks)

A study: Teleworking can help solve Environmental Problems

A team of researchers from Lithuania, Cyprus and Germany discovered that at least 4,0 L of transportation fuel and 7,4 kg of carbon dioxide can be saved per hour of remote work per 100 employees.

 

>> Read More >>

26.01.2022 (291 Clicks)

Glencore & Managem set up Partnership for Moroccan Production of Cobalt from recycled Battery Materials

Glencore and Managem are pleased to announce that they have entered into a partnership to produce Cobalt from recycled cobalt, nickel and lithium at Managem’s CTT Hydrometallurgical Refinery at Guemssa (37 km from Marrakech).

 

>> Read More >>

26.01.2022 (233 Clicks)

RTK From the Sky Technology transforms Hexagon | NovAtel TerraStar-C PRO Service with three Minute global Convergence

In late 2020, Hexagon’s Autonomy & Positioning division announced their technological breakthrough of global RTK From the Sky, demonstrating a future where instantaneous PPP and global RTK-level accuracy is possible.

 

>> Read More >>
F. Willich GmbH + Co. KG
Latest Articles

20.10.2022 

The World stands at the eleventh HourThe World stands at the eleventh Hour

Mankind is facing enormous challenges that threaten to bring major changes in areas such as climate protection, raw materials security and supply chain reliability. By promoting an exchange of ideas and information the bauma 2022 can help to provide and develop practical solutions to these problems....  

#Mining #Geotechnics #communication

20.10.2022 

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable EngineeringWorld’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover. System integration in May 2021 has effectively prevented any instances of serious belt damage. Moreover, service missions have become more efficient and can be scheduled on-demand....  

#Brennero Tunnel Construction (BTC) #HOSCH-Foerdertechnik Recklinghausen GmbH #Tunnelling #Traffic tunnels #Conveyor technology #Digitalisation

20.10.2022 

Sugar Cane sweetens the CO2 Balance of Segment GasketsSugar Cane sweetens the CO2 Balance of Segment Gaskets

Innovative profiles from Sealable Solutions GmbH for sealing between lining segments in mechanically excavated tunnels are more sustainable and improve the CO2 balance. Other relevant product properties are not negatively affected by the avoidance of fossil raw materials....  

#SEALABLE Solutions GmbH #Tunnelling #Traffic tunnels #sealing #sealing technique #pressurised water sealing

Southern African-German Chamber of Commerce and Industry
J. D. Theile GmbH & Co. KG
S-Tec ApS
Current Events

12.01.2023 09:00 - 17:00

vIWASA 2023


06.02.2023 -

Indaba 2023


20.02.2023 - 23.02.2023

GEOAFRICA 2023


02.03.2023 - 03.03.2023

GeoTHERM expo & congress

EXPROTEC GmbH
EXPROTEC GmbH
HUESKER Synthetic GmbH
EXPROTEC GmbH
HUESKER Synthetic GmbH
Hermann Paus Maschinenfabrik GmbH
GeoResources - Mining, Tunnelling, Geotechnics, Energy - News, Events and Journal
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (430 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

#Brennero Tunnel Construction (BTC) #HOSCH-Foerdertechnik Recklinghausen GmbH #Tunnelling #Traffic tunnels #Conveyor technology #Digitalisation

>> read more >>
Books / Bücher
RAG-Technikchronik - Buch 6: Management- und Bildungssysteme für technische Prozesse

RAG-Technikchronik - Buch 6: Management- und Bildungssysteme für technische Prozesse

02. April 2019 (1964 Clicks)

Das Buch 6 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklung der Management- und Bildungssysteme für technische Prozesse, also z.B. zur Effizienzsteigerung, zum Arbeits-, Gesundheits- und Umweltschutz sowie zur Ausbildung und beruflichen Fortbildung, bei der RAG dar.  

#RAG Aktiengesellschaft #Mining #underground mining #abandoned mining

>> read more >>
Most clicked News

13.04.2022 (673 Clicks)

Skanska signs Contract for Work at Wastewater Resource Recovery Facility in NY, USA

Skanska has, as part of a joint venture with R.J. Industries, Inc., signed a ...  

#Skanska #Geotechnics #Supply tunnels #concrete #in-situ concrete #ventilation, dust extraction

>> read more >>
Most clicked News
Microtunnel Boring Machine breaks new Ground with mineral oil-free hydraulic Fluids from German Specialists

25.03.2022 (650 Clicks)

Microtunnel Boring Machine breaks new Ground with mineral oil-free hydraulic Fluids from German Specialists

The Saarbrücken civil engineering contractor SaarGrundbau has successful...  

#SaarGrundbau GmbH & Co. KG #Herrenknecht AG #Fluid Competence GmbH #Tunnelling #Supply tunnels #Hydraulics

>> read more >>
Most clicked News

23.05.2022 (627 Clicks)

Metso Outotec wins Order for large Iron Ore Pellet Plant in Oman

Metso Outotec has signed an agreement for the delivery of engineering and key...  

#Metso Outotec #Vulcan Engineering Co. #processing

>> read more >>
Most clicked News

09.06.2022 (611 Clicks)

Femern A S and SICE-COBRA sign multi-billion Contract

On Monday 30 May, Femern A/S and SICE-COBRA have signed the contract for the ...  

#Sociedad Ibérica de Construcciones Eléctricas (SICE) #Cobra Instalaciones y Servicios (Grupo Cobra) #Femern A/S #Tunnelling #Traffic tunnels

>> read more >>