FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
Secon Systems GmbH
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
Secon Systems GmbH
Southern African-German Chamber of Commerce and Industry
STUVA-Conference 2023 | Familientreffen der Tunnelbranche! | 8. bis 10. November 2023 | ICM München

English Deutsch News-Archive
News - Mining, Tunnelling, Geotechnics, Energy

29.04.2015 (5522 Clicks)

Aker Solutions ASA: First-Quarter Results 2015

Financial Highlights

  • Sales NOK 8.5 billion in 1Q 2015 vs NOK 7.5 billion in 1Q 2014
  • Earnings before interest, taxes, depreciation and amortization (EBITDA) NOK 591 million vs NOK 666 million a year earlier
  • Earnings before interest and taxes (EBIT) NOK 409 million vs NOK 521 million a year earlier
  • EBIT margin 4.8% vs 7% a year earlier
  • EBIT margin ex. one-off items 5.8% vs 7% a year earlier
  • Earnings per share (EPS) NOK 0.79 vs NOK 1.03 a year earlier
  • Order intake NOK 9 billion vs NOK 5.9 billion a year earlier
  • Order backlog NOK 48.3 billion vs NOK 39.6 billion a year earlier
 

>> Read More >>

28.04.2015 (4848 Clicks)

The Danish Parliament adopts the Construction Act for the fixed link across the Fehmarnbelt

On 28 April 2015, the Danish Parliament adopted the proposed Construction Act for the fixed link across the Fehmarnbelt and the Danish landworks.

 

>> Read More >>

28.04.2015 (5654 Clicks)

Dänisches Parlament verabschiedet Baugesetz über Fehmarnbeltquerung

Das dänische Parlament hat am 28. April 2015 das Gesetz über den Bau einer Festen Fehmarnbeltquerung mitsamt einer dänischen Schienen- und Straßenanbindung verabschiedet.

 

>> Read More >>

28.04.2015 (6321 Clicks)

Hochtief announces Change on the Supervisory Board

Beate Bell and Patricia Geibel-Conrad have been appointed as new members of the Supervisory Board of Hochtief Aktiengesellschaft. Dr. Michael Frenzel and Dr. Jan Martin Wicke had previously resigned from their Supervisory Board office.

 

>> Read More >>

28.04.2015 (4971 Clicks)

Parsons' Superstorm Sandy Repair and Rehabilitation Project wins highest Award from ACEC New York

Parsons is pleased to announce that the Superstorm Sandy Repair and Rehabilitation project for the Montague Tunnels in New York City—designed by Parsons—has earned an Engineering Excellence Diamond Award in the transportation category from the American Council of Engineering Companies (ACEC), New York chapter. This is the highest honor bestowed by ACEC and recognizes the most innovative engineering design projects both in New York and throughout the world.

 

>> Read More >>

28.04.2015 (5597 Clicks)

Weltweit einmaliges Messsystem zur Erkundung von Grundwasservorkommen getestet

BGR misst mit Helium-Ballon Kernspinresonanz.

 

>> Read More >>

28.04.2015 (5525 Clicks)

Der Bund hält Wort: Mehr als 300 Millionen Euro für das Nationale Hochwasserschutzprogramm

Als Konsequenz aus der letzten Hochwasserwasserkatastrophe stocken Bund und Länder ihre Investitionen für den präventiven Hochwasserschutz deutlich auf. Allein der Bund stellt in den nächsten Jahren mehr als 300 Millionen Euro für den natürlichen und technischen Hochwasserschutz zur Verfügung und löst damit Zusagen ein, die nach der Flut im Sommer 2013 gemacht und im Nationalen Hochwasserschutzprogramm verankert worden sind. Die Bundesregierung hatte sich im Koalitionsvertrag dazu bekannt, sich stärker koordinierend beim Hochwasserschutz einzubringen. Bundesumweltministerin Barbara Hendricks und Bundeslandwirtschaftsminister Christian Schmidt stellten heute in Berlin die nächsten Schritte vor.

 

>> Read More >>

28.04.2015 (5432 Clicks)

ICE: New Vice President chosen for 2015/16

ICE welcomes a new Vice President who will join the Presidential Team for the 2015/16 presidential year from November. He is Andrew Wyllie CBE, Chief Executive at Costain. He joins current Vice Presidents Tim Broyd, Professor Robert Mair, Keith Clarke, Adrian Coy, Stephen Fox and Zara Lamont and will work with incoming President Sir John Armitt.

 

>> Read More >>

28.04.2015 (5950 Clicks)

Caterpillar China delivers first complete Longwall armored Face Conveyor to Datong Coal Mine Group


Caterpillar (Langfang) Mining Equipment Co. recently manufactured its first full armored face conveyor (AFC) system for longwall mining. Previously the facility, located in Hebei Province, China, had produced only line pans for AFC systems. Producing the first full AFC system marks a milestone in the facility’s evolution as a key mining equipment manufacturing plant for Caterpillar and the region. Langfang premium longwall products will serve mining companies worldwide.


The new Cat® AFC has been delivered to the Datong Coal Mine Group (Tongmei) for use in the Dongzhouyao mine in Shanxi Province. Datong is the third largest state-owned coal mining enterprise in China. Tongmei Group, the parent of Datong, first acquired an AFC in 2004 from the company that is now Caterpillar. Tongmei is the largest AFC customer globally for Caterpillar. The new AFC system marks the 39th delivered to Chinese mines by Caterpillar and its predecessors in the longwall equipment line.

The new AFC system is designed for longwall top coal caving (LTCC) to mine a coal seam as thick as 8 m. Face length will be 260 m. The LTCC mining method enables recovering thick seams economically by cutting the lower portion of the seam as is normally done and then recovering coal that caves as the face moves forward.

The premium face conveyor is composed of Cat PF6 line pans. The innovative modular design separates wear-resistant hardened steel parts and the substructure made of high-strength steel. The design enables easy replacement of wear parts without damaging the substructure. The front AFC has transport capacity of 2500 tonnes per hour, and the rear AFC has capacity of 3000 tonnes. Each of the conveyors has total installed power of 2 x 1050 kW. The beam stage loader is a Cat BSLPF6 with capacity of 3500 tonnes per hour and 600 kW installed capacity.

WesTrac China, the Cat dealer in northern and northeastern China, delivered the system and will provide service and support through its facilities and personnel based in the region. WesTrac China’s network encompasses more than 60 branches, including a world-class rebuild facility in Tianjin. Total staff is now more than 1500 in China.

Source: Caterpillar



Caterpillar, China, mining, supplier, equipment, conveyor, longwall, Datong Coal Mine Group, new product, AFC, LTCC, Cat PF6, Cat BSLPF6, WesTrac, Dongzhouyao, mine

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

28.04.2015 (5872 Clicks)

Akastor ASA: First Quarter Results 2015

The first quarter has been characterized by significant challenges for MHWirth, as the company is adapting to the current market situation. Overall, the remaining portfolio companies have had satisfactory performance during the quarter.

 

>> Read More >>
J. D. Theile GmbH & Co. KG

Informieren Sie sich über offene Stellen und Einstiegsmöglichkeiten bei CFT sowie die Ausbildungsmöglichkeiten in einem zertifizierten Ausbildungsbetrieb.
Latest Articles

11.07.2023 

Innovative fully hydraulic Formwork Carriage with Caterpillar Drive for the Approach Tunnel to the A26 Danube Bridge in Linz in AustriaInnovative fully hydraulic Formwork Carriage with Caterpillar Drive for the Approach Tunnel to the A26 Danube Bridge in Linz in Austria

A fully hydraulic formwork carriage with caterpillar drive was used for the approach tunnel to the A26 Danube Bridge in Linz, a customised special solution for the important Austrian infrastructure ...  

06.04.2023 

Building watertight with a fully bonded System – Ground Sealing at the Senckenberg Campus in GörlitzBuilding watertight with a fully bonded System – Ground Sealing at the Senckenberg Campus in Görlitz

In Germany fresh concrete composite systems are being used increasingly in order to create a reliable seal for concrete structures in areas affected by pressurised water or fluctuating water levels....  

06.04.2023 

A novel, non-circular Tunnel Boring Machine for Underground Mine DevelopmentA novel, non-circular Tunnel Boring Machine for Underground Mine Development

The mining industry excavates many more kilometers of tunnel each year than the civil construction industry, but the use of tunnel boring machines (TBM) in mining has been limited in decades past. T...  

J. D. Theile GmbH & Co. KG
F. Willich GmbH + Co. KG
Redpath Deilmann GmbH
Current Events

02.10.2023 - 04.10.2023

AFTES International Congress 2023


04.10.2023 - 05.10.2023

ESG Africa Conference 2023


08.10.2023 - 13.10.2023

International Snow Science Workshop ISSW 2023


09.10.2023 - 14.10.2023

15th ISRM Congress 2023


Event Overview


Hermann Paus Maschinenfabrik GmbH
Hermann Paus Maschinenfabrik GmbH
Longwall Mining Solutions
Hermann Paus Maschinenfabrik GmbH
Longwall Mining Solutions
Bauwerke im Grundwasser (Webinar)
Fluid Competence GmbH
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (1692 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

read more

Books / Bücher
Buchreihe: Dokumentation der technischen Entwicklung bei der RAG

Buchreihe: Dokumentation der technischen Entwicklung bei der RAG

22. June 2022 (10544 Clicks)

Die Aufgabe der Buchreihe „Dokumentation der technischen Entwicklung bei der RAG“ ist es, das in den vergangenen 50 Jahren im deutschen Steinkohlenbergbau erlangte Fachwissen zu sichern, zu verbreiten und künftigen technischen Entwicklungen Impulse zu geben. Über das Sammeln von Daten und Fakten hinaus stellt die auf insgesamt acht Bücher angelegte Reihe wichtiges Fach- und Lehrmaterial für Betrieb, Praxis und Studium dar.  

read more

HUESKER Synthetic GmbH
HUESKER Synthetic GmbH
S-Tec ApS
HUESKER Synthetic GmbH
S-Tec ApS
FAB
IWASA 2023

Trend News
Herrenknecht announces final breakthrough for Silvertown Tunnel

04.09.2023 (144 Clicks)

Herrenknecht announces final breakthrough for Silvertown Tunnel

Tunnelling at the Silvertown project in London on track for success: using th...  

read more - Herrenknecht-announces-final-breakthrough-for-Silvertown-Tunnel

Trend News
Cimic´s CPB Contractors selected as preferred bidder for Victoria’s Suburban Rail Loop East

19.09.2023 (129 Clicks)

Cimic´s CPB Contractors selected as preferred bidder for Victoria’s Suburban Rail Loop East

Cimic Group’s CPB Contractors has been selected by the Victorian Govern...  

read more - Cimic-s-CPB-Contractors-selected-as-preferred-bidder-for-Victoria-s-Suburban-Rail-Loop-East

Trend News

06.09.2023 (119 Clicks)

Harmony - Loss-of-life incident at Kusasalethu mine

Harmony Gold Mining Company Limited regrets to announce that two employees tr...  

read more - Harmony-Loss-of-life-incident-at-Kusasalethu-mine

Trend News
steute Technologies restructures its business fields

04.09.2023 (111 Clicks)

steute Technologies restructures its business fields

steute Technologies, an international technology company for top-quality swit...  

read more - steute-Technologies-restructures-its-business-fields