08.02.2019 (4503 Clicks)
World’s first all-in-one wet Processing System to be revealed at bauma
Industry-leading wet processing equipment designer and manufacturer CDE has announced plans to introduce its new Combo all-in-one wet processing plant to the global market.
>> Read More >>
08.02.2019 (3615 Clicks)
QRC welcomes South32’s $1 million NQ Flood Donation
The Queensland Resources Council (QRC) has welcomed a $1,000,000 donation by South32 to the North Queensland flood recovery.
>> Read More >>
07.02.2019 (3636 Clicks)
Implenia wins a Contract in Norway
New construction of a road between Sumstad and Hongsand | Tunnels as avalanche protection measures will ensure increased safety | Order volume of around NOK 230 million (around CHF 25 million)
>> Read More >>
07.02.2019 (4057 Clicks)
Strabag awarded Contract to build a Section of the D35 Motorway in the Czech Republic
- Construction of a 12.6 km long section between Opatovice and Časy
- Total contract value: CZK 3.38 billion (~ € 132 million)
- Project schedule: 44 months
>> Read More >>
06.02.2019 (3148 Clicks)
World-first autonomous Trains deployed at Rio Tinto’s Iron Ore Operations
Rio Tinto has successfully deployed AutoHaul, establishing the world’s largest robot and first automated heavy-haul, long distance rail network.
>> Read More >>
05.02.2019 (3238 Clicks)
Keliber appoints financial Advisors for the Lithium Project Investments
Keliber Oy has appointed Carnegie Investment Bank AB and Nordea Bank Abp as advisors for the equity financing for the Company’s mining and lithium chemical production project. Carnegie will be the Global Coordinator for the equity financing. Together with Company, the advisors will explore different financing options, including possibilities for an Initial Public Offering (IPO) through a listing of the Company’s shares, for the construction of the Lithium Project.
Some months ago, Keliber appointed Northcott Capital Limited as the coordinator of the debt financing. Initial contacts have been established with relevant banks and sources of debt financing, and assessments of opportunities are ongoing.
Based on the definitive feasibility study which was completed in June 2018 the total investment of the Lithium Project is estimated to approximately EUR 250 million, and the financing will be investigated as a combination of debt and equity.
“We are pleased that we have an extremely experienced consortium in place to investigate the financing of the Lithium Project. We have been working with Northcott on debt financing already for couple of months and now we will commence active preparations to ensure also the equity financing of the project”, says Jaakko Vilponen, CFO of Keliber Oy.
Source: Keliber
Keliber, Finland, Mining, Financing, lithium, chemical, production, Carnegie, shar, Jaakko Vilponen







04.02.2019 (3117 Clicks)
Vale implements two Sediment Control Membranes on the Paraopeba River
Two of the three membranes that will protect the water withdrawal system of the city of á de Minas, on the Paraopeba River, are already in operation. The second barrier was installed yesterday (3/2/19) and the first, on Saturday (2/2/19). The third will be installed today (4/2/19), weather permitting. Since yesterday, weather in the region has been challenging, with rain and wind reported.
>> Read More >>
04.02.2019 (3700 Clicks)
Epiroc acquires US Water Well Drilling Equipment Distributor
Epiroc, a leading productivity partner for the mining and infrastructure industries, has acquired the assets of Noland Drilling Equipment, a U.S. distributor of water well drilling equipment and related parts, services and consumables.
>> Read More >>
01.02.2019 (4085 Clicks)
bauma 2019: Normet Ground Control and Construction Technologies
Sprayed Concrete
Today, the use of sprayed concrete in mines, tunnels and other civil engineering structures is an important and integral part of successful, highly productive, and safe rock support systems.
>> Read More >>
01.02.2019 (3115 Clicks)
Vale informs on the Hiring of independent Office to assist in the Investigation of the Causes of the Brumadinho Accident
Vale SA informs that it has hired the law firm Skadden, Arps, Slate, Meagher and Flom LLP ('Skadden') to select and work together with a panel of experts to evaluate the causes of the rupture of Dam I in Brumadinho. The office will provide advice to Vale on various legal issues arising from the breakdown of Dam I, including regarding certain initiatives that the company may take in response to the breach.
>> Read More >>
03.11.2023
Inspections of Flexible Protection Systems against Natural Hazards – Using and passing on Special Knowledge
Inspections of flexible protection systems against natural hazards are becoming increasingly important. Geobrugg passes on its knowledge in socalled CONSIS courses to keep the function of structures...
03.11.2023
Recruiting, Developing and Retaining skilled Workers
As a result of demographic trends and the huge challenge that climate change has brought to society many of the companies involved in the geotechnical engineering, tunnel construction and mineral ex...
03.11.2023
German Exploration Geologist in Search of Battery Metals on the other Side of the World
Konrad Behnke studied geology in Germany with a semester and internship abroad. He left his comfort zone during the corona pandemic – travelling first to Scandinavia. He has been working as an...
28.11.2023 - 30.11.2023
Resourcing Tomorrow 2023
12.12.2023 - 13.12.2023
2nd International Congress and Exhibition - Mining of Uzbekistan and Central Asia
14.12.2023 - 15.12.2023
MINING WORLD CONGRESS 2023
14.12.2023 - 15.12.2023
GEOTEC HANOI 2023 – The 5th International Conference on Geotechnics for Sustainable Infrastructure Development

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1952 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 5: Technikentwicklung in der Grubensicherheit - Band I
27. September 2018 (12933 Clicks)
Das Buch 5 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklungen der vergangenen fünf Jahrzehnte aus dem Bereich Grubensicherheit dar. Der erste Band beschäftigt sich mit den Themen Bewetterung, Klimatisierung, Gasbeherrschung, Wetterüberwachung, Gasausbruchs- und Gebirgsschlagverhütung.


27.11.2023 (216 Clicks)
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine
