FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
IVGeobaustoffe, Geokunststoffe, Wasserbau, Straßenbau, Verkehrswegebau, Straßenoberbau, Asphalteinlagen, Erd- und Grundarbeiten, Umwelttechnik, Deponiebau, Eisenbahnbau, Geotextil
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
IVGeobaustoffe, Geokunststoffe, Wasserbau, Straßenbau, Verkehrswegebau, Straßenoberbau, Asphalteinlagen, Erd- und Grundarbeiten, Umwelttechnik, Deponiebau, Eisenbahnbau, Geotextil
Longwall Mining Solutions
IWASA 2023

English Deutsch News-Archive
News - Mining, Tunnelling, Geotechnics, Energy

26.06.2019 (3506 Clicks)

Anglo American details Tailings Storage Facilities

Anglo American plc (“Anglo American”) has published on its website the details of its 91 managed tailings storage facilities (TSFs) and an additional 62 TSFs at non-managed joint venture operations in which it has an interest, as requested by the Church of England Pensions Board and the Swedish Council on Ethics for the AP Funds, representing 96 institutional investors.

 

>> Read More >>

24.06.2019 (3125 Clicks)

Eurogeo 2020 - Call for Abstracts

Abstract submission began 3 June 2019. The deadline for submissions of abstracts ist 30 August 2019.

 

>> Read More >>

24.06.2019 (2254 Clicks)

GeoAmericas 2020 – Keynote Lecturers confirmed and Deadline for Abstracts expanded

Expanded deadline for to submit abstracts with the main theme 'Geosynthetics Solutions for a Fast-Changing World'

See below the sub-topics:

  • Case Histories
  • Design Approaches and Numerical Solutions
  •  

    >> Read More >>

24.06.2019 (2591 Clicks)

Aker Solutions appointed new CFO

Ole Martin Grimsrud has been appointed Chief Financial Officer of Aker Solutions, effective August 1, 2019. He replaces Svein Oskar Stoknes, who is taking over as CFO of Aker ASA on the same day.

 

>> Read More >>

22.06.2019 (2967 Clicks)

Former BHS Warehouse makes Way for new HS2 Station in London


HS2 has released a set of new images showing progress at London Euston where the team this week completed the demolition of the former BHS warehouse on Hampstead Road, close to the new station’s proposed Camden Town entrance.


The 400 metre platforms and concourse of the new mega-station will be built adjacent to the existing station, doubling capacity and improving journeys for millions of people.

The former BHS warehouse was once the centre of the department store’s London distribution network, with the building providing office space above the warehouse, loading bays and basement.

Since the closure of the warehouse, the 5,000 square foot building had been temporarily occupied by UCL’s Bartlett School of Architecture and used by HS2’s contractors as office space.

The building, made up of two separate three and five storey concrete-framed structures, was demolished over 8 months, by a Costain and Skanska team (CSjv) and specialist subcontractors John F Hunt.

A top-down demolition technique was used, with machines lifted onto the top of the buildings and protective screening installed around the outside to limit noise and dust. During the work, more than 35,000 tonnes of concrete was crushed and reused on site. With the demolition complete, the team are now working to finish the clearance of the site, ready for handover to the station construction teams.

Across the UK, more than 9,000 jobs are now supported by HS2 both directly and in the supply chain, delivering essential early works, including demolition, utilities, ecological works and the project’s pioneering archaeological programme.

HS2 Ltd’s Programme Director, Matthew Botelle, said:

“HS2 will transform Euston, delivering much-needed extra capacity, improving journeys and unlocking the opportunity for thousands of new jobs and homes.

“This week’s milestone is the latest evidence of the progress we are making across London. With our fascinating archaeological programme in full swing and more than two thirds of demolitions now complete, I’d like to thank all those involved in the project for their hard work and dedication.”

CSjv’s Programme Director, Peter Jones, said: 'Costain and Skanska have successfully completed yet another major building demolition as part of our huge HS2 enabling works programme. With more than 1,500 people now at work across the capital, we are proud to be part of what will be, the UK’s biggest infrastructure project.”

Across the capital, more than two thirds of demolitions have now been completed, with utility work and the creation of new wildlife habitats as part of HS2’s ‘green corridor’ project, also well underway.

Once complete, the station, could, for the first time, include a new entrance facing north towards Camden Town and west towards Hampstead Road and the shops and restaurants of Drummond Street. In total, the arrival of HS2 will more than double the number of seats out of the station during peak hours.

Source: Costain



Costain, United Kingdom, HS2, Euston, Station, demolition, jobs, progress

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

21.06.2019 (3027 Clicks)

Resource Jobs resourcing Regions

Employment in Queensland’s resources sector has added an extra 5,730 jobs over the last 12 months – the equivalent of one new job every 90 minutes according to the latest Australian Bureau of Statistics (ABS) labour force data.

 

>> Read More >>

20.06.2019 (2644 Clicks)

New Distributor of Superior Industries Idlers and Pulleys in Chile

Superior Industries Inc., a Brazilian-based manufacturer and global supplier of bulk material processing and handling systems, announces Korda Products and Services as its new distributor for conveyor idlers and pulleys. Korda will stock Superior brand idlers and pulleys at its warehouse in Santiago, Chile.

 

>> Read More >>

18.06.2019 (2975 Clicks)

Remembering Dick Robbins 1933-2019

It is with deep sadness that The Robbins Company announces the passing of Richard James Robbins, President and CEO from 1958 to 1993. Dick passed away surrounded by family on Thursday May 30, 2019 in Seattle, Washington, USA. He is survived by his wife Bonnie, son Jim and daughter Jennifer.

 

>> Read More >>

18.06.2019 (3760 Clicks)

New President Boliden Smelters

Daniel Peltonen has been appointed new President Boliden Smelters. He will assume the role during December 2019 and will be part of Boliden's Group Management.

 

>> Read More >>

15.06.2019 (3670 Clicks)

Fugro Seep hunting Success Offshore Malaysia

Fugro has successfully completed the first of three Malaysian seep hunting and geochemical campaigns for the Provision of Surface Geochemical Survey for Domestic Waters for Petroliam Nasional Berhad (PETRONAS), Malaysia’s fully integrated oil and gas company.

 

>> Read More >>
J. D. Theile GmbH & Co. KG

Informieren Sie sich über offene Stellen und Einstiegsmöglichkeiten bei CFT sowie die Ausbildungsmöglichkeiten in einem zertifizierten Ausbildungsbetrieb.
Latest Articles

11.07.2023 

GeoResources Journal 2-2023GeoResources Journal 2-2023
Special Topic: Focus on raw material security and supply chain

GeoResources Journal 2-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on raw material security and supply chain....  

11.07.2023 

Storage Reservoir for a Hydroelectric Power Plant in the Alps - Rock Processing under the toughest ConditionsStorage Reservoir for a Hydroelectric Power Plant in the Alps - Rock Processing under the toughest Conditions

During a comprehensive refurbishment and modernization project the hydroelectric power plant of the Sellrein-Silz power plant expands with a reservoir. The plant technology of rock processing repres...  

11.07.2023 

Innovative fully hydraulic Formwork Carriage with Caterpillar Drive for the Approach Tunnel to the A26 Danube Bridge in Linz in AustriaInnovative fully hydraulic Formwork Carriage with Caterpillar Drive for the Approach Tunnel to the A26 Danube Bridge in Linz in Austria

A fully hydraulic formwork carriage with caterpillar drive was used for the approach tunnel to the A26 Danube Bridge in Linz, a customised special solution for the important Austrian infrastructure ...  

F. Willich GmbH + Co. KG
moduscom unternehmenskommunikation - die etwas andere Art der Werbe-Dienstleistung
Fluid Competence GmbH
Current Events

21.09.2023 - 27.09.2023

XIV IAEG Congress 2023 - Chengdu, China


26.09.2023 - 28.09.2023

POWTECH 2023


27.09.2023 - 28.09.2023 17:00

HTU-EU-2023 - Hydrogen Technology Expo Europe


28.09.2023 - 29.09.2023

AusIMM New Leaders Summit 2023


Event Overview


HUESKER Synthetic GmbH
HUESKER Synthetic GmbH
DMT GmbH & Co. KG
HUESKER Synthetic GmbH
DMT GmbH & Co. KG
Geobrugg AG - Safety is our Nature
URETEK Deutschland GmbH
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (1669 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

read more

Books / Bücher
Buchreihe: Dokumentation der technischen Entwicklung bei der RAG

Buchreihe: Dokumentation der technischen Entwicklung bei der RAG

22. June 2022 (10321 Clicks)

Die Aufgabe der Buchreihe „Dokumentation der technischen Entwicklung bei der RAG“ ist es, das in den vergangenen 50 Jahren im deutschen Steinkohlenbergbau erlangte Fachwissen zu sichern, zu verbreiten und künftigen technischen Entwicklungen Impulse zu geben. Über das Sammeln von Daten und Fakten hinaus stellt die auf insgesamt acht Bücher angelegte Reihe wichtiges Fach- und Lehrmaterial für Betrieb, Praxis und Studium dar.  

read more

denkbetrieb
denkbetrieb
Bauwerke im Grundwasser (Webinar)
denkbetrieb
Bauwerke im Grundwasser (Webinar)
Seetech GmbH
11. Kolloquium Fördertechnik im Bergbau - 2024

Trend News
Australia: 400 mine jobs in limbo due to Queensland Government decision on QCoal’s Glenden

31.08.2023 (164 Clicks)

Australia: 400 mine jobs in limbo due to Queensland Government decision on QCoal’s Glenden

The State Government’s decision to pass legislation forcing mining comp...  

read more - Australia-400-mine-jobs-in-limbo-due-to-Queensland-Government-decision-on-QCoal-s-Glenden

Trend News
Herrenknecht announces final breakthrough for Silvertown Tunnel

04.09.2023 (138 Clicks)

Herrenknecht announces final breakthrough for Silvertown Tunnel

Tunnelling at the Silvertown project in London on track for success: using th...  

read more - Herrenknecht-announces-final-breakthrough-for-Silvertown-Tunnel

Trend News
Metso’s headquarters moves to Matinkylä, Espoo

01.09.2023 (134 Clicks)

Metso’s headquarters moves to Matinkylä, Espoo

Metso moves its headquarters to Matinkylä, Espoo, in September 2023, and...  

read more - Metso-s-headquarters-moves-to-Matinkylae-Espoo

Trend News
Elebbre uses latest auction tech to remarket mine and construction equipment in Chile

30.08.2023 (126 Clicks)

Elebbre uses latest auction tech to remarket mine and construction equipment in Chile

Global engineering, procurement and construction giant Bechtel chooses Latin ...  

read more - Elebbre-uses-latest-auction-tech-to-remarket-mine-and-construction-equipment-in-Chile