FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
Initiative zur Förderung der Rohstoffkultur
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
Initiative zur Förderung der Rohstoffkultur
Seetech GmbH
International Conference on High-Performance Mining - Making the Mine of the Future Tangible - 7-8 September 2023 - Aachen - Germany

English Deutsch News-Archive
GeoResources - Mining, Tunnelling, Geotechnics, Energy - News, Events and Journal

05.11.2020 (1749 Clicks)

Malaysian Tunnellers beat the Odds again


On 11 October 2020, the last of the tunnel ring making up the 13.5 km-stretch of the Klang Valley Mass Rapid Transit (KVMRT) twin bored tunnels was finally completed. Part of a 52 km alignment known as the Putrajaya line, it is the second extension to the first Kajang line, and also Malaysia’s first metro network meant to connect satellite towns to its capital city, Kuala Lumpur (KL).

The job required 8 Variable Density (VD) tunnel boring machines (TBM), 4 Earth Pressure Balance (EPB) TBMs, 16,000 tunnel segment rings and thousands in workforce for the construction of 11 underground stations — doubling as TBM launching and retrieval shafts — and other ancillary structures. It is no mean feat, bearing testament to the ingenuity of its builder, Gamuda Engineering (GE).

Stoked by their debut success with the timely completion of Kajang Line’s underground section, GE found themselves pitted once more against the unique challenges of tunnelling in Kuala Lumpur. In the Kajang line, there were 7 underground stations and 9.5 km of twin tunnels involved, many of which were nestled in Kuala Lumpur’s notorious karstic limestone. This time around, the Putrajaya Line tunnels are deeper, with more complex geological interfaces between Kenny Hill, KL limestone and even an abrasive granite region — not present on the Kajang Line — where frequent, almost daily stops were required to replace worn TBM cutting tools and carry out preventative maintenance.

Other than the more complex geology, the Putrajaya Line tunnels also traverse close to critical infrastructures, such as major railway lines, elevated transits, and even their past projects, the Stormwater Management and Road Tunnel (SMART) as well as the Kajang Line tunnels.

Despite all the above, the entire Putrajaya Line is on track for full opening by January 2023. In fact, GE has hardly been undeterred when it comes to achieving what was often deemed impossible.

Leading tunnel specialist, Gusztáv Klados (Gus), with up to 50 years of industry experience under his belt describes the phenomenal growth of GE whom he has been with for almost 20 years. “When we started with the Stormwater Management and Road Tunnel (SMART) project in 2002, a lot of people told us we were crazy, we can’t build a tunnel in the middle of KL.”

Yet, with adequate preparation and collaboration with TBM manufacturer, Herrenknecht, where GE engineers experienced first-hand how to assemble a TBM, the job was delivered excellently. They even got ahead of their German counterparts who were in charge of the Northern tunnel section.

“Once we were awarded the construction of Line One (Kajang line) tunnels, we had to build on the capabilities of the people who were with the company and nurture local knowledge and talent,” Gus says. In fact, it is with such capabilities and commitment to the task, that the VD TBM, was developed to tackle the challenging geology of the Kajang line. Gamuda Engineering Head of Tunnels, Ng Hau Wei, adds, “continuity of the project from SMART, to the Kajang line and now to the Putrajaya line definitely kept us in momentum, but it ultimately boils down to having the right set of people and the best machines.”

The “best machines” does not only stop at the VD TBM. In the Putrajaya line, GE stepped up their game further, breaking the frontiers of construction technology with the introduction of the world’s first autonomous tunnel boring machine (ATBM) system. Dubbed ATBM, the system was plugged into 10 of the TBMs used in the Putrajaya line to boost overall productivity, safety and quality of tunnel construction using artificial intelligence. “With the VD TBM, we could switch between multiple slurry and EPB modes with ease in a single drive. With the ATBM system, the possibilities are endless as we now have supervision over tunnelling parameters and operations for multiple machines simultaneously, at the speed and accuracy of a computer.” Ng says.

The ATBM has won two prestigious international innovation awards in 2019, namely the Technical Equipment Innovation of the Year Award at the 2019 International Tunnelling and Underground Space Association (ITA) Tunnelling Awards in Miami, Florida and the Innovation in Tunnel Excavation Award at the Tunnelling Festival Awards in the UK sponsored by the British Tunnelling Society.

As for the “right set of people”, both Gus and Ng commend the aptitude and agility of GE’s expertise with project management. In one example, a TBM codenamed S-777 was initially intended for a tunnel drive between two stations only. Due to unforeseen delays, a recovery plan was introduced: upon breakthrough at its original destination, the TBM will be pulled across the station box and launched from the other end to make up for lost time. The scheme proved successful as their impressive project milestones have shown.

Another example is the management’s commitment to staying ahead of the Covid-19 crisis amidst construction. Many control measures were strategically applied early on throughout the mega project and has proven successful in safeguarding their workforce from possible breakouts.

The contractor’s capabilities even extend to that of tunnelling machinery. The Putrajaya Line tunnels were in fact built with several TBMs from Kajang line refurbished by the contractors themselves. “As we speak, 11 TBMs from the Putrajaya line are already being carefully stored and maintained at our refurbishment facility in anticipation of upcoming tunnelling projects,” said Ng.

With the remainders of the Putrajaya Line underground station construction fast closing on us, Gamuda Engineering is ready to move on to other complex tunnelling projects, be it in Malaysia or elsewhere. As Gus sums it up “our technical knowledge is convertible … there will be other places where we have an opportunity and we will have a good chance of getting jobs.”

Malaysian tunnellers are now more ready than ever for it international foray.

Source: MMC Gamuda



Gamuda, Engineering, Malaysia, Tunnelling, KVMRT, segment, TBM, milestone, Herrenknecht, Kuala Lumpur, Putrajaya, metro, Klados, Ng Hau Wei, ATBM, Award, experience, underground

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

05.11.2020 (586 Clicks)

Anglo American Platinum closes ACP Phase B resulting in temporary build in work-in-progress Inventory

Anglo American plc notes the announcement by Anglo American Platinum Limited released today to the Johannesburg stock exchange. The text of the announcement is copied below:

 

>> Read More >>

05.11.2020 (671 Clicks)

Traveling together: Hatch and LTK join together to form top Rail and Transit Solutions Provider

Hatch welcomes LTK – a transportation engineering consulting firm that specializes in transit, transit vehicles, and transit systems - into its global network as part of Hatch’s global Infrastructure team. This new partnership will provide a solid foundation to position Hatch as a top transportation solutions provider in North America and around the globe.

 

>> Read More >>

04.11.2020 (640 Clicks)

Haver & Boecker Niagara appoints Australian National Sales Manager

Haver & Boecker Niagara announces the appointment of Duncan Hooper as its national sales manager in Australia. Hooper will help grow Haver & Boecker Niagara’s presence in Australia, working one-on-one with new and existing customers to provide the equipment and services they need to maximize the profitability of their aggregates and mining operations.

 

>> Read More >>

03.11.2020 (527 Clicks)

Webinar Series on environmentally friendly Mining – Experts share their Knowledge

Mining experts from TU Bergakademie Freiberg will be offering trilingual online seminars on responsible raw material mining and recultivation over the next two months. Interpreting is available in Russian, Ukrainian and German.

 

>> Read More >>

03.11.2020 (644 Clicks)

Metso Outotec divests its Operations in Vereeniging, South Africa

Consultations evaluating the closure or other alternatives related to former Metso operations in Vereeniging, South Africa, have been concluded. The consultations, initiated by Metso in March 2020, have resulted in the decision to divest the fabrication, machining and assembly operations and close or rearrange the rest of the operations.

 

>> Read More >>

03.11.2020 (648 Clicks)

Normet launches a completely new Equipment Offering with Stage V engines and new Cabin for Underground Operations

Normet has launched its new L-size equipment offering with Stage V emission class engines on 3rd of November 2020. Stage V engine technology reduces the diesel particles significantly providing cleaner working environment for the people underground.

 

>> Read More >>

03.11.2020 (735 Clicks)

Strabag to upgrade an approx. 55 km long Railway Line in Hungary

  • Single-track line between Püspökladány and Biharkeresztes to be electrified, bottlenecks removed and stations renovated
  • € 132 million contract awarded to SR 2019 consortium (Strabag’s share: 45.34 %)
  • Electrification of the line should again enable an average speed of 100 km/h
 

>> Read More >>

29.10.2020 (688 Clicks)

Fugro’s QuickVision and InclinoCam Solutions support Monopile Installation for first Wind Turbines in US federal Waters

Fugro has used their integrated augmented-reality solutions to support Jan De Nul Group’s offshore installation of two monopiles for the first two offshore wind turbine foundations in US federal waters.

 

>> Read More >>

29.10.2020 (721 Clicks)

Major welcomes new authorized Dealer: Aggregate Machinery Specialist

Major appoints Aggregate Machinery Specialist as its newest aggregate and mining screen media authorized dealer.

 

>> Read More >>
F. Willich GmbH + Co. KG
Latest Articles

06.04.2023 

GeoResources Journal 1-2023GeoResources Journal 1-2023
Special Topic: Focus on nature and climate

GeoResources Journal 1-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on nature and climate....  

#Herrenknecht AG #CFT GmbH - Compact Filter Technic #DMT GmbH & Co. KG #J. D. Theile GmbH & Co. KG #F. Willich GmbH + Co. KG #Tunnelling

06.04.2023 

Focus on Nature and Climate – a Turning Point and constructive CooperationFocus on Nature and Climate – a Turning Point and constructive Cooperation

A close connection with nature and respectful interaction despite diversity are important keys for a turning point in climate protection.

...  

#Mining #Tunnelling #Geotechnics #Energy

06.04.2023 

Realistic large-scale Tests on self-healing Fresh-concrete Composite Seal with swelling Nonwoven in Tunnel ConstructionRealistic large-scale Tests on self-healing Fresh-concrete Composite Seal with swelling Nonwoven in Tunnel Construction

To avoid damage to polymeric geomembranes for tunnels in conventional construction method, an innovative fresh-concrete composite seal (FCC seal) was developed and tested in realistic large-scale tr...  

#BPA GmbH Waterproofing Systems #Tunnelling #polymeric geosynthetic barrier (GBR-P) #nonwoven geotextile (GTX-NW)

FAB
moduscom unternehmenskommunikation - die etwas andere Art der Werbe-Dienstleistung
Schulungsformate für die Bereiche: Umwelttechnik, Grundbau und Bodenmechanik - civilserve Academy
SMT Scharf GmbH
SMT Scharf GmbH
Deutsches Medikamenten Hilfswerk action medeor e. V. Die Notapotheke der Welt
SMT Scharf GmbH
Deutsches Medikamenten Hilfswerk action medeor e. V. Die Notapotheke der Welt
Fluid Competence GmbH
denkbetrieb
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (1197 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

#Brennero Tunnel Construction (BTC) #HOSCH-Foerdertechnik Recklinghausen GmbH #Tunnelling #Traffic tunnels #Conveyor technology #Digitalisation

>> read more >>
Books / Bücher
RAG-Technikchronik - Buch 5: Technikentwicklung in der Grubensicherheit - Band II

RAG-Technikchronik - Buch 5: Technikentwicklung in der Grubensicherheit - Band II

01. November 2020 (5012 Clicks)

Das Buch 5 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklungen der vergangenen fünf Jahrzehnte aus dem Bereich Grubensicherheit dar. Der zweite Band behandelt die Staubbekämpfung und die technischen Maßnahmen im Arbeitsschutz.  

#RAG Aktiengesellschaft #Mining #underground mining #abandoned mining #de-dusting technology #ventilation, dust extraction

>> read more >>
DMT GmbH & Co. KG
DMT GmbH & Co. KG
Geobrugg AG
DMT GmbH & Co. KG
Geobrugg AG
Hermann Paus Maschinenfabrik GmbH
21. Altbergbaukolloquium auf dem UNESCO-Welterbe Zollverein

Trend News
Roland Hecken to become new COO at HBT GmbH

11.05.2023 (249 Clicks)

Roland Hecken to become new COO at HBT GmbH

Since May 2, 2023, Roland Hecken has joined the management of HBT GmbH as Tec...  

#HBT GmbH #Hauhinco Maschinenfabrik GmbH & Co. KG #EXPROTEC GmbH #Mining #underground mining #Machinery for Mining and Construction

>> read more >>
Trend News
EU-funded MaDiTraCe project: technical solutions for transparent ESG-standards for critical raw material supply chains

10.05.2023 (231 Clicks)

EU-funded MaDiTraCe project: technical solutions for transparent ESG-standards for critical raw material supply chains

In January 2023 MaDiTraCe, a research and innovation project funded by the Ho...  

#DMT GmbH & Co. KG #Mining #surface mining, quarrying #underground mining

>> read more >>
Trend News
LKAB - Historic permit application decisive for the green transition in the north

15.05.2023 (177 Clicks)

LKAB - Historic permit application decisive for the green transition in the north

LKAB today submitted an historic environmental permit application that is nec...  

#LKAB #Vattenfall AB #Mining #surface mining, quarrying

>> read more >>
Trend News
Sika Successfully Closes MBCC Acquisition - Strengthens Position as Sustainability Champion in the Global Construction Industry

03.05.2023 (150 Clicks)

Sika Successfully Closes MBCC Acquisition - Strengthens Position as Sustainability Champion in the Global Construction Industry

Sika has completed the acquisition of MBCC Group after having received all ne...  

#Sika AG #MBCC Group #Tunnelling

>> read more >>