11.03.2021 (474 Clicks)
Coffey is rebranding to Tetra Tech Coffey
In April 2021, Coffey will rebrand to Tetra Tech Coffey - a natural next step in the evolution focusing on Leading with Science® to deliver innovative and sustainable solutions for its clients.
>> Read More >>
11.03.2021 (445 Clicks)
Fugro performs environmental and geotechnical Surveys Offshore Angola
Fugro has been awarded multiple contracts by Eni Angola to carry out geotechnical and environmental surveys off the coast of Angola between now and May, and two Fugro vessels from their world’s largest fleet of specialist geotechnical and geophysical vessels are currently active in the region.
>> Read More >>
11.03.2021 (524 Clicks)
New President of the Australasian Land and Groundwater Association
Dr Sarah Richards, Senior Principal Geoenvironmental Engineer at Coffey, a Tetra Tech company, has been appointed the new president of the Australian Land and Groundwater Association.
>> Read More >>
11.03.2021 (506 Clicks)
Change in the Board of Executive Directors of K+S
Holger Riemensperger appointed as new member of the Board of Executive Directors
>> Read More >>
10.03.2021 (1006 Clicks)
polysius pure oxyfuel – Best-in-class technology for Carbon Capture in Cement Production – next Step: World’s first industrial Application
The production of cement releases large quantities of carbon dioxide (CO2). Only a third of these CO2 emissions result from the combustion of fossil fuels such as coal or petroleum coke, while the biggest share is released by the calcination of limestone. Depending on quality, limestone – the main component of cement – consists of 35% to 44% CO2.
>> Read More >>
10.03.2021 (373 Clicks)
Balfour Beatty announces 2020 Full Year results
Record year end order book and net cash: capacity for enhanced returns
>> Read More >>
10.03.2021 (416 Clicks)
Qld Resources Sector celebrates record-breaking Year in Diversity Stakes and announces Winners of Women in Resources Awards
Queensland Resources Council (QRC) Chief Executive Ian Macfarlane today congratulated Queensland’s 2021 Exceptional Woman in Resources winner Maryann Wipaki and Exceptional Young Woman in Resources winner Ashleigh Turner on their outstanding contributions to the state’s resources sector.
>> Read More >>
09.03.2021 (589 Clicks)
Fortrac T eco – The high-tensile Geogrid made from high-quality PET recycled Yarn
- 100% recycled yarn in original fiber quality
- Resource and CO2 savings
- Economical and sustainable
>> Read More >>
09.03.2021 (430 Clicks)
HS2 launches Contract Race for Engineering Management System
HS2 began the search for a specialist contractor to deliver the high-tech monitoring systems that will enable remote supervisory control of railway assets and systems by key operational personnel allowing the UK to run some of the world’s most reliable, safe and efficient high-speed rail services.
The new contract opportunity covers the design, manufacture, installation, integration, testing and commissioning of an integrated Supervisory Control and Data Acquisition (SCADA) solution that will be used across the whole network – and up to 25 years of technical support.
The Engineering Management System (EMS), which is principally a software system, will provide an integrated SCADA layer by consolidating multiple SCADA systems from multiple domains and contracts. This will enable the status of HS2’s railway assets and systems to be monitored in real time from the Network Integrated Control Centre in Birmingham and other key locations, facilitating both the operation and maintenance of the railway.
Worth an estimated £65m, the EMS will be one of the most advanced in the world, using diagnostic and analytical functionality for predictive maintenance enabling problems to be identified before they occur.
HS2 Ltd’s Procurement and Commercial Director, David Poole said: “HS2’s Engineering Management System will play a crucial role in the operation and maintenance of the network, allowing operational personnel and engineers to monitor and analyse the condition of the infrastructure in real time. This data will make it possible for maintenance to be planned in advance allowing HS2 to run some of the most reliable services anywhere in the world. With construction now well underway and more than 15,000 jobs already supported by the project, these contract opportunities are another important opportunity for companies across the UK to get involved in delivering Britain’s new high speed rail line.”
Shortlists are set to be announced in the summer with contract award in 2022.
Source: HS2 Ltd
HS2, United Kingdom, Engineering, Management, System, EMS, Software, contractor, search, railway, high, speed, David Poole, operation, installation, management, SCADA







08.03.2021 (432 Clicks)
Volvo Autonomous Solutions forms Partnership with Foretellix
Volvo Autonomous Solutions has signed an agreement with verification experts Foretellix to jointly address the challenges of large-scale verification of autonomous driving solutions on highways and confined areas, such as mines.
>> Read More >>
11.07.2023
Dare to recycle more!
Increased recycling of critical metals such as tungsten can make raw material supplies more secure and sustainable worldwide. To achieve this, closed value cycles should be established. Achieving th...
11.07.2023
Sustainable Sediment Management in Reservoirs
Dams and reservoirs are suffering from increasing siltation as a result of sediment deposition. This poses a threat to drinking water supplies, flood defences and flora and fauna in the downstream reaches and also compromises hydroelectric power generation systems. An efficient and sustainable sediment management regime is therefore urgently needed....
11.07.2023
Game Tip – Go Goals!
The United Nations have created the “Go Goals!” game for children. You can help to achieve the 17 Sustainable Development Goals (SDGs) and are invited to use the game in your environment...
21.09.2023 - 27.09.2023
XIV IAEG Congress 2023 - Chengdu, China
26.09.2023 - 28.09.2023
POWTECH 2023
27.09.2023 - 28.09.2023 17:00
HTU-EU-2023 - Hydrogen Technology Expo Europe
28.09.2023 - 29.09.2023
AusIMM New Leaders Summit 2023

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1669 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 3: Technikentwicklung in der Vorleistung
27. September 2018 (10331 Clicks)
Das Buch 3 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Evolution der Vorleistung in den vergangenen 50 Jahren dar. Da sie den Zugang zur Lagerstätte schafft, ist sie die Grundvoraussetzung zur Gewinnung des Rohstoffs Kohle und bildet die Grundlage für den langfristig sicheren und leistungsfähigen Betrieb eines Bergwerks.


31.08.2023 (164 Clicks)
Australia: 400 mine jobs in limbo due to Queensland Government decision on QCoal’s Glenden
The State Government’s decision to pass legislation forcing mining comp...


04.09.2023 (138 Clicks)
Herrenknecht announces final breakthrough for Silvertown Tunnel
Tunnelling at the Silvertown project in London on track for success: using th...


01.09.2023 (134 Clicks)
Metso’s headquarters moves to Matinkylä, Espoo
Metso moves its headquarters to Matinkylä, Espoo, in September 2023, and...


30.08.2023 (126 Clicks)
Elebbre uses latest auction tech to remarket mine and construction equipment in Chile
Global engineering, procurement and construction giant Bechtel chooses Latin ...
