GeoResources Journal for Resources, Mining, Tunnelling, Geotechnics, Equipment and Energy
For detailed results feel free to use our search tool.

GeoResources Journal 4-2018
20. January 2019
( 22616 Clicks / 11864 Downloads )
ISSN: Print 2364-8422 / Online 2364-8430
We are pleased to present to you the issue 4-2018 of the English Journal GeoResources.
Here is the table of contents. To download the GeoResources Journal click on individual headlines of the articles!







Citation Page: 5–6
“Creating Spaces” or “Less is more”
Are creative phases lacking in your life? Time for creating spaces can provide a remedy.







Citation Page: 7–14
Polymer Injection Groutings in hydraulic Engineering Dam Structures
Hydraulic earth dams, e. g. dykes, often possess inadequate or even no waterproofing so that seepage can occur possibly affecting the stability during impounding. Within the scope of a R+D project, a Low Pressure Injection (LPI) method for soft grounds was developed, capable of achieving a higher sealing level through the application of acrylate gels. The focus is directed at eliminating leaks in seals, the connecting areas between the earth and massive structure as well as crossings. Mixing the granular structure with the injection grout substantially improves the shear and uniaxial compressive strength and significantly reduces the hydraulic conductivity in the grouted soil matrix.







Citation Page: 15–18
Building with Geosynthetics in the Stuttgart-Ulm Major Project of the Deutsche Bahn AG – Part 1 Waterproofing the Track to protect the Groundwater
Geosynthetics are being used in different areas and for different purposes in the Deutsche Bahn AG’s Stuttgart-Ulm major project. Part 1 of a series of articles examines waterproofing the Track on the Alb Plateau section with geomembranes.







Citation Page: 19–25
Micropiling in Urban Infrastructure: Advantages, Experience and Challenges
Increasing urbanization places high demands on urban infrastructure. New infrastructure is required and existing facilities have to be extended. Intraurban interventions causing the least possible disturbance are frequently carried out in densely populated and built-up areas within a tight timeframe. Micropiling can contribute towards satisfying the challenges. This article presents infrastructure projects using self-drilling micropiles in four areas: public services, transportation, telecommunications and heritage conservation. The special requirements are briefly described, and the geotechnical solutions presented. Finally, a summary of micropiling in urban areas is given.







Citation Page: 26–27
Attenuator System for Rockfall Protection – Presentation of an innovative Dimensioning Concept
Geobrugg developed together with international experts an attenuator protection solution which can be efficiently dimensioned. This low maintenance rockfall protection was presented in Canada.







Citation Page: 28–29
20 Years Anniversary of Geoconsult Asia Singapore
Geoconsult Asia Singapore celebrated with more than 200 guests and employees 20 years of successful and reliable operation not only in Singapore, but in the whole Asia-Pacific region. On occasion of this anniversary, Geoconsult organized a technical symposium in September 2018 presenting some of the most interesting topics of the world wide operating company.







Citation Page: 30–33
Freezing Operations for Cross-Passages in the Tunnel beneath the Suez Canal in Egypt
The Deilmann-Haniel GmbH is executing freezing operations to produce the cross-passages in the road tunnel beneath the Suez Canal in Egypt. This article deals with the technical and construction operational challenges.







Citation Page: 34–36
A 10 Tauern Motorway near Zederhaus in Austria – Infiltration-proof geosynthetic System for Noise Reduction Tunnel
The Asfinag (Austrian Motorway and Highway Financing Corporation) invested in a complex noise protection measure on the A10 motorway near Zederhaus. The Huesker Synthetic GmbH devised an innovative, infiltration-proof sealing system made of geosynthetics for the noise reduction tunnel produced by cut-and-cover.







Citation Page: 37–38
About Tunnelling in China
Roland Herr interviewed Professor Jenny Yan. She is currently the Vice President of the ITA; Vice President of the Chinese Tunnelling and Underground Works Society of CCES and Deputy General Manager of China Railway Academy Co., Ltd.







Citation Page: 39–40
CTUC – International Chinese Tunnel and Underground Works Conference in Chuzhou
With more than 1,600 chinese and about 130 international tunnel experts, the Chinese Tunnelling and Underground Works Society of CCES (China Civil Engineering Society) very successfully organized the 20th Chinese Tunnel and Underground Works Conference (CTUC) in 2018.







Citation Page: 41
New English Book about Hydrogeology
The classic German book about hydrogeology by Hölting and Coldewey is now available in English as well.







Citation Page: 42–47
Blast Performance Improvement using Stemming Plugs at Limestone Quarries in the Salt Range of Pakistan
Stemming inside a blast hole plays a vital role for optimizing blast results. Blasting may result in issues like flyrock and an unnecessary number of boulders. At some sites, blasted material does not move laterally to generate good throw with blasting. As a solution to the existing problems, newly developed stemming plugs have been tested on-site to check their performance. This paper presents blasting tests using stemming plugs on limestone quarries in the Salt Range of Pakistan. The results demonstrate better fragmentation with a reduced number of boulders and better throw of blasted material. The productivity of loading operations increases and the overall operational costs at quarries can be reduced.







Citation Page: 47
CFT GmbH Compact Filter Technic successfully completes Cooling Projects
The CFT GmbH Compact Filter Technic recently accomplished international cooling projects with innovative solutions to ventilate tunnel drives and mines as well as shaft sinking schemes in conjunction with the WAT Wärme-Austausch-Technik GmbH.







Citation Page: 48–49
Creating a near-zero Hazard Working Environment leveraging IoT
Many accidents occur every day in working environments – avoidable and unavoidable by unforeseeable events. HCL’s Worker Safety solution aims to make risk-oriented occupations safer and to create a near-zero hazard working environment.







Citation Page: 48–49
Creating a near-zero Hazard Working Environment leveraging IoT
Many accidents occur every day in working environments – avoidable and unavoidable by unforeseeable events. HCL’s Worker Safety solution aims to make risk-oriented occupations safer and to create a near-zero hazard working environment.







31.01.2023
SNC-Lavalin awarded contract to replace Florida bridge over the Intracoastal Waterway
31.01.2023
Subway to provide connectivity between Terminal 1 IGI Domestic Airport Metro Station (Magenta Line) and Arrival Terminal 1 of the IGI Domestic Airport in Delhi opened for passengers
06.02.2023 -
Indaba 2023
07.02.2023 - 09.02.2023
UCT 2023 - 28th Annual Underground Construction Technology

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (601 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.
#Brennero Tunnel Construction (BTC) #HOSCH-Foerdertechnik Recklinghausen GmbH #Tunnelling #Traffic tunnels #Conveyor technology #Digitalisation
>> read more >>
RAG-Technikchronik - Buch 1: Technikentwicklung und Forschung der RAG
27. December 2019 (2782 Clicks)
Das Buch 1 "Technikentwicklung und Forschung der RAG" behandelt zusammenfassend die Ergebnisse der Bücher 2 bis 6 und ergänzt um das Thema Lagerstätte aus dem Buch 7. Das Thema „Forschung und Entwicklung“ wird genauso behandelt, wie der Streckenausbau, die Entwicklung der Technikbereiche, die Bergwerksautomatisierung und die Unternehmensdigitalisierung.
#RAG Aktiengesellschaft #Mining #Digitalisation
>> read more >>
12.01.2023 (305 Clicks)
Europe’s largest Deposit of Rare Earth Metals is located in the Kiruna Area
LKAB has identified significant deposits of rare earth elements in the Kiruna...
#LKAB #Mining #Energy #underground mining
>> read more >>
07.01.2023 (191 Clicks)
Masan High-Tech Materials integrates global R&D activities under leadership of H.C. Starck Tungsten Powders
H.C. Starck Tungsten Powders is bringing together the research and developmen...
#H.C. Starck Tungsten GmbH #Mining
>> read more >>
24.01.2023 (182 Clicks)
K + S appointed Dr. Carin-Martina Tröltzsch to the Board of Executive Directors
The Supervisory Board of K+S Aktiengesellschaft has appointed Dr. Carin-Marti...
#K+S AG #Mining #underground mining
>> read more >>
07.01.2023 (172 Clicks)
Implenia wins large and complex tunnelling project in Norway – E03 Boknafjord tunnel
- Joint Venture of Implenia and Stangeland Maskin selected to plan and ...
#Implenia Construction GmbH #Tunnelling #Traffic tunnels
>> read more >>