Journal Search

Reset filter
J. D. Theile GmbH & Co. KG
Journal Search

Reset filter
J. D. Theile GmbH & Co. KG
S-Tec ApS
Journal Search
Reset filter
23. Kolloquium Bohr- und Sprengtechnik 2023

Bauen im und am Wasser -  9. Deutscher Geotechnik Konvent

S-Tec ApS
english(31) deutsch(33) GeoResources Zeitschrift & Journal
    RSS-Feed copy RSS-Feed-Link to clipboard

GeoResources Journal for Resources, Mining, Tunnelling, Geotechnics, Equipment and Energy

For detailed results feel free to use our search tool.

GeoResources Journal 3-2015

11. November 2015
( 80140 Clicks / 59833 Downloads )

ISSN: Print 2364-8422 / Online 2364-8430

#Brummermann, Katrin #König, Manfred

We are pleased to present to you the GeoResources Journal issue 3-2015.

Here is the table of contents. To download the GeoResources Journal click on individual headlines of the articles!

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 5–6

The Fehmarnbelt Tunnel: more than just an Infrastructure Project

In 2008, Germany and Denmark signed a state treaty for the construction of a Fehmarnbelt tunnel with connecting rail and road links. Following several years of planning, the approval procedures are now drawing to a close. The Fehmarnbelt Tunnel will close the final gap between Scandinavia and Continental Europe.

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 7–15

Creative geotechnical Solutions for Renovating the Dresden Old Masters Picture Gallery in the Zwinger – Part 2: Injections for Enlarging a Tunnel

Renovating the Old Masters Picture Gallery in the east wing of the Dresden Zwinger is also challenging in geotechnical terms. Part 2 of this report deals with injections required for ground consolidation for a tunnel enlargement. The tunnel is intended to serve as an underground passage for visitors entering the Picture Gallery. The tricky subsoil, conservation, ongoing activities in the museum and existing lines and cables represented the challenges to be faced.

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 16–28

Gotthard Base Tunnel: The Sedrun Shaft Hoisting Systems – Part 2: Conversion and Operating Phase

#Flender, Michael

The 57 km long Gotthard Base Tunnel was produced in five contract sections with three intermediate points of attack. The Sedrun intermediate point of attack consists of two blind shafts some 820 m deep, which could only be reached via a roughly kilometre long access tunnel. The complex, tricky general conditions and the high demands placed on the availability of the shaft hoisting systems were and still are a particular challenge for building and operating the facilities. This second part of the report concentrates on dismantling and modifying the shafts (Lot 356) and the functions of the ultimate hoisting systems (Lot D) of the Sedrun shafts for the rail tunnel’s operating phase. This called for a well harmonized logistics and installation concept. Part 1 dealt with the building and operation of the shaft hoisting systems as a hoisting, material and man riding shaft and installations for cooling the air in the Faido tunnel section for the tunnel construction phase.

#Gotthard-Base-Tunnel #Switzerland (CH) #SIEMAG TECBERG GmbH #AlpTransit Gotthard AG #Tunnelling #Traffic tunnels #shaft sinking #shaft hoisting facilities #operation of shafts #shaft sinking

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 29–38

Gotthard Base Tunnel: Planning and Executing the Installations for the Sedrun Shaft I

#Schöneshöfer, Moritz #Ahlbrecht, Thomas

The Gotthard Base Tunnel’s Sedrun intermediate point of attack with its two blind shafts represents a logistical and technical challenge. This report describes how two interesting parts of the contract for Shaft I were tackled. In order to avoid an air short circuit, Sedrun Shaft I was provided with a hydraulically operated, two-part closing flap with apertures for the two guide sections at the shaft head. The particular challenge in developing the closing flap related to its required tightness or rather the maximum permitted leakage volume. The two steel guide sections posed special problems for planning, manufacturing and assembly. The anchor brackets had to comply with the static and structural requirements and provide a manageable guide length for standardizing assembly procedures. The further requirements atypical of mining for the two guide rail sections related to the temperature-related clearance between the individual guides, which had to be absolutely complied with given climatic marginal conditions with fluctuations in temperature varying from + 40°C in summer to – 20°C in winter.

#intermediate heading Sedrun #Gotthard-Base-Tunnel #Switzerland (CH) #railway #planning #REDPATH DEILMANN GmbH #Tunnelling #Traffic tunnels #shaft sinking #Shaft sinking services #design and engineering #shaft hoisting facilities

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 39–43

New Teeth for the Chain Conveyor – Innovative Sprocket provides improved Efficiency and reduced Costs

Chain conveyors represent essential factors for mining mineral raw materials underground or transporting spoil in tunnelling. The Halbach & Braun Industrieanlagen GmbH has devised an innovative sprocket with replaceable toothed strips for such chain conveyors thus contributing to improved efficiency and reduced costs. This new development has been applied successfully in practice in a Chinese coal mine.

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 44–47

Latest Developments in Longwall Mining Technology

Ever higher requirements from mine operators have led to numerous significant developments in longwall mining technology over the past decades. Mining companies are looking for higher productivity, longer lifetime of the equipment, higher degree of automation, full system solutions, increased safety, and equipment suitable for ultra-high or low seam applications. Being in the longwall business for more than 70 years, Caterpillar Global Mining and its predecessors have invented state-of-the-art solutions over and over again to meet those challenging demands with the overall goal of minimizing the operational costs for the operators.

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

Citation     Page: 48–49

Injection Resin System passes Fire Test for Approval according to Mining Ordinance Health Provisions

Dywidag Systems International GmbH (DSI) has added a injection resin to its range of products. The injection resin recently passed the fire test to obtain the approval according to the German Mining Ordinance Health Provisions.

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

GeoResources
J. D. Theile GmbH & Co. KG
GeoResources
EXPROTEC GmbH
EXPROTEC GmbH
DMT GmbH & Co. KG
Southern African-German Chamber of Commerce and Industry
Fluid Competence GmbH
Secon Systems GmbH
Redpath Deilmann GmbH
Redpath Deilmann GmbH
GeoResources - Mining, Tunnelling, Geotechnics, Energy - News, Events and Journal
Redpath Deilmann GmbH
GeoResources - Mining, Tunnelling, Geotechnics, Energy - News, Events and Journal
Rudolf von Scheven GmbH
FAB
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (606 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

#Brennero Tunnel Construction (BTC) #HOSCH-Foerdertechnik Recklinghausen GmbH #Tunnelling #Traffic tunnels #Conveyor technology #Digitalisation

>> read more >>
Books / Bücher
RAG-Technikchronik - Buch 6: Management- und Bildungssysteme für technische Prozesse

RAG-Technikchronik - Buch 6: Management- und Bildungssysteme für technische Prozesse

02. April 2019 (2837 Clicks)

Das Buch 6 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklung der Management- und Bildungssysteme für technische Prozesse, also z.B. zur Effizienzsteigerung, zum Arbeits-, Gesundheits- und Umweltschutz sowie zur Ausbildung und beruflichen Fortbildung, bei der RAG dar.  

#RAG Aktiengesellschaft #Mining #underground mining #abandoned mining

>> read more >>
Geobrugg AG
Geobrugg AG
URETEK Deutschland GmbH
Geobrugg AG
URETEK Deutschland GmbH
Seetech GmbH
GeoResources

Trend News
Europe’s largest Deposit of Rare Earth Metals is located in the Kiruna Area

12.01.2023 (325 Clicks)

Europe’s largest Deposit of Rare Earth Metals is located in the Kiruna Area

LKAB has identified significant deposits of rare earth elements in the Kiruna...  

#LKAB #Mining #Energy #underground mining

>> read more >>
Trend News
K + S appointed Dr. Carin-Martina Tröltzsch to the Board of Executive Directors

24.01.2023 (214 Clicks)

K + S appointed Dr. Carin-Martina Tröltzsch to the Board of Executive Directors

The Supervisory Board of K+S Aktiengesellschaft has appointed Dr. Carin-Marti...  

#K+S AG #Mining #underground mining

>> read more >>
Trend News
Masan High-Tech Materials integrates global R&D activities under leadership of H.C. Starck Tungsten Powders

07.01.2023 (207 Clicks)

Masan High-Tech Materials integrates global R&D activities under leadership of H.C. Starck Tungsten Powders

H.C. Starck Tungsten Powders is bringing together the research and developmen...  

#H.C. Starck Tungsten GmbH #Mining

>> read more >>
Trend News
Implenia wins large and complex tunnelling project in Norway – E03 Boknafjord tunnel

07.01.2023 (184 Clicks)

Implenia wins large and complex tunnelling project in Norway – E03 Boknafjord tunnel

  • Joint Venture of Implenia and Stangeland Maskin selected to plan and ...  

    #Implenia Construction GmbH #Tunnelling #Traffic tunnels

    >> read more >>