20.06.2023
Skanska builds the E10-rv. 85 road project in northern Norway
Skanska has secured the contract for design and construction of the E10/rv. 85 road project in northern Norway procured by the Norwegian Public Roads Administration (NPRA). The contract is worth NOK 11.4 billion, about SEK 11.4 billion, which will be included in the Nordic order bookings for the second quarter of 2023.

20.06.2023
MACA awarded five-year open pit mining contract extension
MACA announced the extension of its open pit mining contract at the Gruyere gold mine, a joint venture (JV) between Gold Fields and Gold Road Resources. The project is located approximately 1,200 kilometres north-east of Perth in Western Australia’s north-eastern goldfields region.

20.06.2023
Gold again for Implenia in the EcoVadis Sustainability Rating
Implenia once again achieves Gold status in 2023 EcoVadis Sustainability Rating | Remains in top five percent in its industry | Further improvement in point score confirms Implenia as industry leader

19.06.2023
Qld Govt’s coal royalty advertising campaign is misleading
The Queensland Government’s taxpayer-funded advertising campaign launched this afternoon about coal royalties is highly misleading, the Queensland Resources Council (QRC) said.

![]() | ![]() |
16.06.2023
Bauer BCS 185: The new compact cutter system for confined construction sites

Bauer BCS 185: The new compact cutter system for confined construction sites (Credits: BAUER Group)
Bauer brought its first cutter to the market almost 40 years ago, thereby starting a success story that has now introduced a new chapter: In April, the company presented its new BCS 185 cutter system, which has really struck a chord with customers.
“Our multi-functional MC duty-cycle cranes are used for a wide range of applications, first off as base carriers for our cutters and grabs, but also for lifting work or dynamic soil compaction,” explains Leonhard Weixler, Head of the Diaphragm Wall Division at Bauer Maschinen. “For anyone who doesn’t require this multi-functionality but needs equipment that is specially optimized for trench cutting, we have extended our BCS portfolio with the newly developed BCS 185. And the feedback from our customers is excellent.” This latest model of Bauer Cutter Systems (BCS) can cut trenches up to a depth of 90 m. In addition, the special design of our BCS systems combines proven technology with a vast variety of other useful features as well as the necessary modularity for today’s ever stricter transport requirements.
Solide base
The base carrier is a Bauer MT 185. The solid design offers high stability and comprehensive HSE features, including a rear view camera, integrated service platforms and ergonomic, highly comfortable cab layout. Operators used to our Bauer MC models are sure to feel at home quickly, since the inner workings of the cab are identical to the Bauer duty-cycle cranes. A variety of electronic assistance systems (integrated into the latest version of the BAUER B-Tronic system) supports the operator effectively and increase productivity at the same time. The MT 185 is equipped with a fuel-efficient, powerful Volvo engine, which complies to all different emissions standards worldwide.
Continuously adjustable cutter position
The BCS 185 is of course also available with the Bauer Turning Device, which allows this cutter to work in extremely confined construction sites and will still be able to ‘cut the corners’. “This is making the difference in today’s cutter operations,” remarks Leonhard Weixler. It allows the cutter to be twisted within a range of -50 to +95 degrees from its normal position to reach every corner in the excavation pit without a problem. Together with the overall compact dimensions of the BCS 185, the range of efficient cutter applications under restricted space conditions is further enhanced.
Streamlined special equipment for mid-sized applications
Attentive observers will also notice the arrangement of the hose drums in the boom, thanks to which the cutter system delivers a highly streamlined impression overall. The 30 t winch was specifically designed for use in the mid-sized range. With the maximum hook load of 43 t, the BCS 185 can be equipped with a wide range of Bauer cutters allowing trench widths of up to 1,500 mm. This makes the system as a whole even more attractive: The Bauer cutter system is not subject to crane permit regulations, hence any requirements for the operators are eliminated.
First operations in China and Europe
Just on display at Bauer’s In-House Exhibition in Schrobenhausen as well as in a product launch event in Tianjin in China, the new cutter system already started its operation in the South of China. It had been shipped to the construction site beginning of June and was assembled in a record time of only 22 hours. The first unit in Europe will soon travel to the French city of Toulouse. This BCS 185 will be used on a cutter project together with other Bauer cutters. “The BCS series, our MC-based cutter systems as well as our world novelty, the Bauer Cube System complement one another fantastically,” Leonhard Weixler remarks confidently. “And with that, Bauer once again demonstrates why we are the leading manufacturer of the worldwide most productive cutter systems!”
Source: Bauer Group







03.11.2023
Recruiting, Developing and Retaining skilled Workers
As a result of demographic trends and the huge challenge that climate change has brought to society many of the companies involved in the geotechnical engineering, tunnel construction and mineral ex...
03.11.2023
Brenner Base Tunnel: innovative Sandvik DT923i convinces in Blasting of the main Tunnels
In the Brenner Base Tunnel, the innovative DT923i tunnel drill rig from In the Brenner Base Tunnel, the innovative DT923i tunnel drill rig from Sandvik is in use for the first time in Central Europe...
03.11.2023
Students from Freiberg University Mines Rescue and Mine-gas Protection Brigade highly placed at International Event
A team from Freiberg University of Mining and Technology has taken second place at this year’s MERD international mines rescue competition (Mine Emergency Rescue Development), which was held a...
12.12.2023 - 13.12.2023
2nd International Congress and Exhibition - Mining of Uzbekistan and Central Asia
14.12.2023 - 15.12.2023
MINING WORLD CONGRESS 2023
14.12.2023 - 15.12.2023
GEOTEC HANOI 2023 – The 5th International Conference on Geotechnics for Sustainable Infrastructure Development
18.12.2023 - 19.12.2023
ICGGE 2023: 17. International Conference on Geotechnical and Geological Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1969 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 5: Technikentwicklung in der Grubensicherheit - Band I
27. September 2018 (13026 Clicks)
Das Buch 5 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklungen der vergangenen fünf Jahrzehnte aus dem Bereich Grubensicherheit dar. Der erste Band beschäftigt sich mit den Themen Bewetterung, Klimatisierung, Gasbeherrschung, Wetterüberwachung, Gasausbruchs- und Gebirgsschlagverhütung.


27.11.2023 (407 Clicks)
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine


02.11.2023 (156 Clicks)
Sandvik secures fossil-free steel for future manufacturing of loaders and trucks
