26.07.2023
The proposed Rithala-Narela Metro Corridor may be extended up to Kundli in Haryana in India
The proposed Rithala-Narela corridor of the Delhi Metro Rail Corporation (DMRC) may possibly be extended up to Kundli in Haryana to provide additional connectivity to the neighbouring state. If approved, this will be Delhi Metro’s fourth expansion into Haryana after Yellow Line (Gurugram), Violet Line (Faridabad) and Green Line (Bahadurgarh).

26.07.2023
ASTA strengthens E-Mobility Footprint with new Plant in China
With the groundbreaking ceremony for a new E-Mobility plant in July, ASTA has opened a new chapter. The ~1,000m2 large facility, complete with its own research laboratory, is built next to an existing plant in Baoying, China. It meets the high requirements of the automotive industry and the E-Mobility sector. Completion is scheduled for the end of 2023.

![]() | Market-Place-4.0 Strabag SE |
25.07.2023
Strabag UK opens flagship tunnel segment ring factory in Hartlepool

Strabag UK opens flagship tunnel segment ring factory in Hartlepool (Credits: HS2)
- Expansion and conversion of production site in Hartlepool, North East England, completed
- Highly automated fabrication of tunnel segments for HS2, the new high-speed railway initially linking London and the West Midlands
- Reducing material consumption and carbon footprint
On Monday 24th July 2023, Ruth Todd, Chief Commercial Officer for HS2, Jill Mortimer, MP for Hartlepool, Gerald Zangl, Head of Strabag’s International & Tunnelling Division and Andy Dixon, MD Commercial Strabag UK, cast the first tunnel segment ring at Strabag UK’s new factory in Hartlepool, North East England. For Strabag, this is the beginning of the manufacturing of precast concrete tunnel segments for HS2 tunnels in London and the rest of the UK.
Strabag will be delivering over 83,000 precast concrete segments for HS2’s London tunnels, having won a contract to supply Skanska Costain Strabag JV (SCS JV) in October 2021.
The site at Hartlepool docks, operated by PD Ports, was chosen because of its connections by rail and sea. The team have taken an old oil rig fabrication site and developed a modern precast concrete segment ring factory, creating over 100 jobs for local people.
The factory houses a state-of-the-art automated segment carousel and reinforcement hall. In addition, by reinstating the previously disused railhead and platform at the site, segments can now be transported by rail to HS2’s London logistics hub near Willesden Junction in London and straight to the tunnels’ portals.
Klemens Haselsteiner, CEO Strabag SE, said:
“This is an extremely exciting day for Strabag’s UK operations. This not only puts Strabag firmly on the map in the North East of England, along with our facility in Wilton for the Woodsmith Mine project, but also across the whole of the UK.
Having direct access to the rail network means that we can take a significant number of lorries off of UK roads. This creates a more sustainable solution in the way that we transport tunnel segment rings to our London TBMs for HS2, resulting in a reduction of our carbon footprint.”
Ruth Todd CBE, HS2’s Chief Commercial Officer, said: “HS2 is already bringing benefits to the UK economy, creating jobs around the country as part of the construction and manufacturing required for HS2. Strabag’s choice of location in Hartlepool for its new facility demonstrates a commitment to bringing new job and training opportunities to the North East.”
Further information
- 100,000 m³ of concrete will be used to construct the segments which will be 0.35m thick and will weigh 7 tonnes each.
- The contract for the lease at the site in Hartlepool has been signed for several years demonstrating Strabag’s long-term commitment to manufacturing in the North East of England.
- The state-of-the-art automated segment carousel will also be controlled by telemetry to produce the high-quality reinforcement cages required for each segment.
- Together with optimised 3D reinforcement planning, newly developed templates and a new design for the reinforcement cages, the use of robotics ensures shorter turnaround times and better quality in production.
- The automation and robotics used in the factory will reduce steel reinforcement wastage to negligible volumes and lead to a significantly better energy efficiency.
- By using rail instead of road to move over 83,000 segments, we avoid over 56,000 lorry journeys and reduce CO2 emissions by 76 %.
Source: Strabag SE







25.07.2023
New CFO at Doosan Lentjes
On 13 July, Kisoon Park took over the position of Chief Financial Officer (CFO) at Doosan Lentjes, a leading provider of environmental technologies. Kisoon Park replaces Sanghoun Park, who had been in charge of finance on the executive board since 2020.

03.11.2023
GeoResources Journal 3-2023
Special Topic: Focus on fairness and skilled workforce.
GeoResources Journal 3-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on fairness and skilled workforce....
03.11.2023
Long-term Monitoring of backfilled Salt Mines – a new wireless Rock-pressure Measuring System
Wired rock-pressure measuring systems are not rated as suitable for the long-term monitoring of abandoned salt mines as they are expensive, technically complex and lacking in functional reliability....
03.11.2023
Optimisation of Salt Production at Heilbronn Mine using a Combination Approach to conventional Mining and mechanical Cutting
Heilbronn mine has been producing rock salt for many years using both conventional mining and mechanical cutting, the two methods being operated independently of each other. With the rearrangement o...
28.11.2023 - 30.11.2023
Resourcing Tomorrow 2023
12.12.2023 - 13.12.2023
2nd International Congress and Exhibition - Mining of Uzbekistan and Central Asia
14.12.2023 - 15.12.2023
MINING WORLD CONGRESS 2023
14.12.2023 - 15.12.2023
GEOTEC HANOI 2023 – The 5th International Conference on Geotechnics for Sustainable Infrastructure Development

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1955 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 4: Technikentwicklung in der Logistik
27. December 2018 (12952 Clicks)
Das Buch 4 der Buchreihe „Dokumentation der technischen Entwicklung bei der RAG“ zeigt die Entwicklungen der vergangenen fünf Jahrzehnte im Bereich Logistik der RAG. Die Logistik unter Tage wurde durch die flächige Entwicklung des Steinkohlenbergbaus, z.B. durch Anschluss- oder Verbundbergwerke, und die Zunahme der Gewinnungsteufe vor erhebliche Herausforderungen gestellt.


27.11.2023 (242 Clicks)
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine
