![]() | Market-Place-4.0 Implenia Construction GmbH |
03.08.2023
Implenia wins another complex railway infrastructure project in Switzerland with Lot 2 Tunnel Ligerz

Implenia wins another complex railway infrastructure project in Switzerland with Lot 2 Tunnel Ligerz (Credits: SBB)
SBB awards contract for Lot 2 “Tunnel Ligerz” to joint venture led by Implenia | Total volume of CHF 220 million | Joint venture partners are Bernasconi and De Luca
The SBB contract for lot 2 “Tunnel Ligerz” was assigned to joint venture IBD, consisting of the partners Implenia (lead), Bernasconi and De Luca. The total contract volume is CHF 220 million, Implenia's share is around CHF 150 million.
The contract comprises the 2.1 km long double-track tunnel, of which around 1,850 m by mining and around 250 m by cut-and-cover, including concrete lining and railway technology. In addition, four escape tunnels, a 114 m long viaduct for the exit of highway N5 and various additional structures are being built. The excavated material will be transported by ship and the existing railway line will be dismantled and redesigned.
The aim of the project is to eliminate the last railway bottleneck on the “Jurafuss” line between Lausanne and Biel. Due to the prevailing narrow space conditions between the lake and the slope, where the N5 national road and the cantonal road also run, a new double-track tunnel will be built.
The location of the project in protected areas is also a particular challenge: The region is listed in the Federal Inventory of Landscapes and Natural Monuments (BLN). The villages of La Neuveville, Chavannes, Ligerz and Twann are part of the Federal Inventory of Swiss Heritage Sites of National Importance (ISOS).
Implenia's experts in the fields of civil engineering, tunnelling, special foundations, civil structures, railway engineering and maritime work are being deployed. Christian Späth, Head Division Civil Engineering of Implenia: "We are looking forward to carrying out this large and complex rail infrastructure project together with our joint venture partners and once again demonstrating our longstanding experience and expertise in this area. We wish the entire project team an accident-free construction period."
Source: Implenia







02.08.2023
Germany based Mining Equipment Company HBT acquired Waratah Engineering, Australia
HBT GmbH advised that as of Thursday the 20th of July, HBT and Questas entered into a Share Purchased Agreement to procure Newcastle (Australia) based Original Equipment Manufacturer, Waratah Engineering.

01.08.2023
New report maps Australia’s emerging ‘Silicon Valleys’
Australia’s digital technology clusters have been mapped and analysed on a national scale for the first time as part of a new report released by Australia’s national science agency, CSIRO, and the Tech Council of Australia. The report, ‘The geography of Australia’s digital industries’, explores how the geographical concentration of innovation – like Silicon Valley in California – boosts growth and productivity.

01.08.2023
'STEM Big Day Out' launches in Central Qld
260 Central Queensland high school students are set to take part in the state’s first ever STEM Big Day Out which puts the spotlight on a whole new era of exciting careers for young people in the resources sector. Students will receive an insight into the world of STEM (Science, Technology, Engineering and Maths) through a unique program developed by the Queensland Resources Council’s education arm, the Queensland Minerals and Energy Academy (QMEA) and supported by BHP Mitsubishi Alliance (BMA).

31.07.2023
Glencore to overtake Pan American stake in MARA Project
Glencore to acquire Pan American’s 56.25% stake in MARA Project, becoming its sole owner
Glencore International AG (Glencore) and Pan American Silver Corp. (NYSE: PAAS, TSX: PAAS) (Pan American) announced they have reached an agreement for Glencore to acquire the 56.25% stake in the MARA Project (MARA or the Project) from Pan American.

03.11.2023
German Exploration Geologist in Search of Battery Metals on the other Side of the World
Konrad Behnke studied geology in Germany with a semester and internship abroad. He left his comfort zone during the corona pandemic – travelling first to Scandinavia. He has been working as an...
03.11.2023
Optimisation of Salt Production at Heilbronn Mine using a Combination Approach to conventional Mining and mechanical Cutting
Heilbronn mine has been producing rock salt for many years using both conventional mining and mechanical cutting, the two methods being operated independently of each other. With the rearrangement o...
11.07.2023
Sustainable Sediment Management in Reservoirs
Dams and reservoirs are suffering from increasing siltation as a result of sediment deposition. This poses a threat to drinking water supplies, flood defences and flora and fauna in the downstream reaches and also compromises hydroelectric power generation systems. An efficient and sustainable sediment management regime is therefore urgently needed....
12.12.2023 - 13.12.2023
2nd International Congress and Exhibition - Mining of Uzbekistan and Central Asia
14.12.2023 - 15.12.2023
MINING WORLD CONGRESS 2023
14.12.2023 - 15.12.2023
GEOTEC HANOI 2023 – The 5th International Conference on Geotechnics for Sustainable Infrastructure Development
18.12.2023 - 19.12.2023
ICGGE 2023: 17. International Conference on Geotechnical and Geological Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1987 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 4: Technikentwicklung in der Logistik
27. December 2018 (13166 Clicks)
Das Buch 4 der Buchreihe „Dokumentation der technischen Entwicklung bei der RAG“ zeigt die Entwicklungen der vergangenen fünf Jahrzehnte im Bereich Logistik der RAG. Die Logistik unter Tage wurde durch die flächige Entwicklung des Steinkohlenbergbaus, z.B. durch Anschluss- oder Verbundbergwerke, und die Zunahme der Gewinnungsteufe vor erhebliche Herausforderungen gestellt.


27.11.2023 (517 Clicks)
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine


22.11.2023 (132 Clicks)
Start-up Northvolt develops state-of-the-art sodium-ion battery validated at 160 Wh per kg
