![]() | Market-Place-4.0 Metso Outotec Artemis Gold Inc. |
21.06.2022
Metso Outotec to deliver Comminution Equipment to Artemis Gold in Canada
Metso Outotec has been awarded a contract for the delivery of key crushing and grinding equipment to Artemis Gold’s Blackwater Gold project in Central British Columbia in Canada.
The order value, which is confidential, has been booked in Minerals’ Q2/2022 order intake.
Metso Outotec’s scope of delivery consists of the supply of the SuperiorTM MK-III 4265 primary gyratory crusher, the Nordberg® HP900™ secondary and tertiary cone crushers and 14MW PremierTM ball mill for the Phase 1 process plant at Blackwater.
“We are pleased to be chosen as the supplier of the state-of-the-art comminution technology for the Blackwater Gold project. This development further solidifies Western Canada as a premier mining region that is continuing to grow. We are ready and proud to support the region’s expansion with our end-to-end offering including services that span across the lifecycle,” says Giuseppe Campanelli, President, North and Central America, Metso Outotec.
Source: Metso Outotec







21.06.2022
Pilot Trial Based on Ore from Keliber’s Largest Deposit Resulted in High Conversion Rate
Keliber has completed the first three phases of a four-phase pilot-scale test programme. A high conversion rate of 96.3% was achieved in a continuous high-temperature conversion pilot trial performed in cooperation with FLSmidth.

17.06.2022
Hatch hosts 53rd H.G. Acres Symposium in Canada
Hatch recently hosted the 53rd annual H.G. Acres Symposium at the office in Mississauga, Ontario. The event brought together twelve presenters from the power industry, along with clients, partners, and Hatch colleagues, to delve into the theme of “Powering Positive Change” and discuss hydropower and its key role in the clean energy transition.

17.06.2022
Metso Outotec collaborates with Dynamox on introducing advanced digital Solutions for Condition Monitoring
Metso Outotec and Dynamox have entered into a global cooperation agreement on the usage of Dynamox’s condition monitoring platform in mining and aggregates processes. Metso Outotec is offering the solution to its own installed equipment base; the partner agreement enables also third-party equipment monitoring, further strengthening the company’s digital scalability and solution flexibility.

16.06.2022
AusIMM’s Thought Leadership Series set to drive Change in the Era of Disruption
AusIMM’s free online Thought Leadership Series returns from July to September in 2022, with five on demand webinars exploring the role of resources professionals in an era of disruption.

03.11.2023
GeoResources Journal 3-2023
Special Topic: Focus on fairness and skilled workforce.
GeoResources Journal 3-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on fairness and skilled workforce....
03.11.2023
Focus on Fairness and Skilled Labour – for sustainable Living Conditions
Skilled professionals in our geotechnical, tunnelling, mining and raw materials sectors make an important contribution to sustainable and fair living conditions.
...
03.11.2023
Inspections of Flexible Protection Systems against Natural Hazards – Using and passing on Special Knowledge
Inspections of flexible protection systems against natural hazards are becoming increasingly important. Geobrugg passes on its knowledge in socalled CONSIS courses to keep the function of structures...
12.12.2023 - 13.12.2023
2nd International Congress and Exhibition - Mining of Uzbekistan and Central Asia
14.12.2023 - 15.12.2023
MINING WORLD CONGRESS 2023
14.12.2023 - 15.12.2023
GEOTEC HANOI 2023 – The 5th International Conference on Geotechnics for Sustainable Infrastructure Development
18.12.2023 - 19.12.2023
ICGGE 2023: 17. International Conference on Geotechnical and Geological Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (1969 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 5: Technikentwicklung in der Grubensicherheit - Band II
01. November 2020 (13027 Clicks)
Das Buch 5 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Entwicklungen der vergangenen fünf Jahrzehnte aus dem Bereich Grubensicherheit dar. Der zweite Band behandelt die Staubbekämpfung und die technischen Maßnahmen im Arbeitsschutz.


27.11.2023 (407 Clicks)
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine


02.11.2023 (156 Clicks)
Sandvik secures fossil-free steel for future manufacturing of loaders and trucks
