SMT Scharf GmbH
SMT Scharf GmbH
FAB
SMT Scharf GmbH
FAB
Longwall Mining Solutions
11. Kolloquium Fördertechnik im Bergbau - 2024

English News Deutsche News News     RSS-Feed copy RSS-Feed-Link to clipboard
News - Mining, Tunnelling, Geotechnics, Energy

30.03.2023

CharIN launches new Mining Taskforce in partnership with ICMM – Addressing technical bottlenecks to accelerate progress on zero emission mining vehicle fleets (Credits: CharIN)CharIN launches new Mining Taskforce in partnership with ICMM – Addressing technical bottlenecks to accelerate progress on zero emission mining vehicle fleets

The challenge of electrifying mining haul truck operations has taken a step forward with the launch of the CharIN Mining Taskforce, a partnership between global organizations CharIN and ICMM. The partnership enables ICMM to address technical bottlenecks around the interoperability of battery-electric charging systems for the roll-out of zero emission greenhouse gas (GHG) mining vehicles, expected to begin this decade.  

read more - CharIN-launches-new-Mining-Taskforce-in-partnership-with-ICMM-Addressing-technical-bottlenecks-to-accelerate-progress-on-zero-emission-mining-vehicle-fleets

30.03.2023

Fugro Geo-data supports development of newest large-scale hydro pumped storage scheme in UK (Credits: Fugro)Fugro Geo-data supports development of newest large-scale hydro pumped storage scheme in UK

SSE Renewables has awarded Fugro a ground investigation contract for its Coire Glas hydro pumped storage scheme located in the Great Glen in Scotland. With a potential capacity of up to 1500MW, Coire Glas was in the news recently when SSE Renewables announced that it was to make a £100 million investment to see the project progress as the first large-scale pumped storage scheme to be developed in the UK for more than 40 years.  

read more - Fugro-Geo-data-supports-development-of-newest-large-scale-hydro-pumped-storage-scheme-in-UK

29.03.2023

Metso Outotec completes strategic review of its Metals business (credits: Metso Outotec)Metso Outotec completes strategic review of its Metals business

Metso Outotec has completed the strategic review of its Metals business. As a conclusion, the company has decided to initiate the divestment of two of its three Metals businesses: Metals & Chemical Processing and Ferrous & Heat Transfer. The Smelting business will remain part of Metso Outotec’s portfolio.  

read more - Metso-Outotec-completes-strategic-review-of-its-Metals-business
Hermann Paus Maschinenfabrik GmbHMarket-Place-4.0
Bauer Resources GmbH

28.03.2023

45 geothermal probes for vacant office building in an urban environment – Bauer Resources is building a geothermal heating system


45 geothermal probes for vacant office building in an urben environment – Bauer Resources is building a geothermal heating system (Credits: Bauer Group)

45 geothermal probes for vacant office building in an urben environment – Bauer Resources is building a geothermal heating system (Credits: Bauer Group)

Wherever you look, construction space is scarce in city centers. Sooner rather than later, cities will have to react to the situation. Unused buildings can offer a real opportunity here. So how about an abandoned factory? Or an old office complex? Sounds unrealistic, but it's not. The key word is revitalization. One classic example of this is the "Mergenthaler" project in Eschborn, Germany: A vacant office building from the 1980s is to be revitalized by 2024 using resource-efficient and CO2-reducing methods on behalf of the Munich-based real estate company Wöhr + Bauer. The core element of this project is a sustainable energy concept – which is exactly why Bauer Resources GmbH is building a geothermal heating system.

Meter by meter into the depths

Preparations began in spring 2022. The geothermal probe field was planned precisely in advance to avoid damaging any underground pipelines during drilling. "This is a crucial step, especially with existing buildings," remarks Marcel Moesslang, Project Manager at BAUER Resources GmbH. Once planning was finished, he and his team produced the geothermal probes using the flush drilling method. The principle: A drilling rig drills hole after hole and injects a special drilling mud slurry into the subsoil at high pressure. This extracts the slurry as well as the drilling debris so that the probes can be installed afterwards. In this way, holes deeper than 100 m were drilled for 45 geothermal probes.

Piece by piece with great accuracy

As with many inner-city projects, the limited space for construction sites was a major challenge, the Project Manager emphasizes: “Working with the large machines in narrow spaces was challenging. With a distance of less than 2 m from the building, our drilling work had to maintain the specified distances from the property line. Every move has to be spot on." In addition, there was a lot of activity around the construction site: a kindergarten and numerous commercial units, for example the headquarters of Deutsche Börse – all located in the immediate vicinity. Specially insulated equipment was therefore used to reduce noise. "Precautions to protect residents are always our top priority," says Marcel Moesslang.

Full speed ahead with geothermal heat

Even after the main work was completed, there was still plenty for the specialists from Bauer Resources to do, such as installing the connection lines: More than 2,200 linear meters of lines were laid in four weeks and connected to a total of four distribution shafts. The geothermal probes were then flushed and filled with a heat transfer fluid. Since then, the construction site has been on pause until the owner completes the rehabilitation work. Last but not least, hydraulic balancing is then carried out and assistance is provided with commissioning. After completion of the work, "MERGENTHALER" will then be supplied with heating and cooling thanks to the geothermal energy. In total, the system can generate around 200 kW of power – which is roughly equivalent to the heating energy requirements of 40 modern single-family homes.

In addition to the green energy supply, many other sustainability components are implemented in "Mergenthaler": a thermally insulating facade with floor-to-ceiling glazing and external sun protection, a sky garden of around 1,000 m² and 50 e-charging stations. With the slogan: Preserve existing buildings and revitalize them using green methods. "Mergenthaler is really close to our hearts," adds Dr. Tim Malonn, Head of the Value-Add business unit at the owner Wöhr + Bauer. "Together with many partners, we are creating a real showcase project here using innovative methods and a resource-efficient approach to construction. Demolition is avoided and we save around 42% in CO2 emissions during construction alone compared to an equivalent new building."

Source: Bauer Group

 

share on Whatsapp   share on Whatsapp   share on Telegram   share on FaceBook   share on Twitter   share on Xing   share on LinkedIn   

>> close >>

28.03.2023

Centre of Excellence for Tunnelling and Underground Space Engineering to come up at Delhi Metro Rail Academy Campus

The Delhi campus of the Centre of Excellence for Tunnelling & Underground Space Engineering (CETUSE) shall be set at the Delhi Metro Rail Academy (DMRA) in Shastri Park. This facility shall be an integral part of DMRA and is expected to be ready by the end of this year.  

read more - Centre-of-Excellence-for-Tunnelling-and-Underground-Space-Engineering-to-come-up-at-Delhi-Metro-Rail-Academy-Campus
GeoResources

Informieren Sie sich über offene Stellen und Einstiegsmöglichkeiten bei CFT sowie die Ausbildungsmöglichkeiten in einem zertifizierten Ausbildungsbetrieb.
Latest Articles

03.11.2023 

Focus on Fairness and Skilled Labour – for sustainable Living ConditionsFocus on Fairness and Skilled Labour – for sustainable Living Conditions

Skilled professionals in our geotechnical, tunnelling, mining and raw materials sectors make an important contribution to sustainable and fair living conditions.

...  

11.07.2023 

Blasthole Drilling Technology: where to next?Blasthole Drilling Technology: where to next?

Machine development seems to have gone as far as it can in the blasthole drilling sector. This paper presents the state-of-the-art technology as used in underground and surface mining and in the quarrying and tunnelling industries and examines the limits to further development in these areas. ...  

06.04.2023 

GeoResources Journal 1-2023GeoResources Journal 1-2023
Special Topic: Focus on nature and climate

GeoResources Journal 1-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on nature and climate....  

Mining, Tunnelling, Geotechnics, Energy - News, Events and Journal - GeoResources
Rudolf von Scheven GmbH
IVGeobaustoffe, Geokunststoffe, Wasserbau, Straßenbau, Verkehrswegebau, Straßenoberbau, Asphalteinlagen, Erd- und Grundarbeiten, Umwelttechnik, Deponiebau, Eisenbahnbau, Geotextil
moduscom unternehmenskommunikation - die etwas andere Art der Werbe-Dienstleistung
moduscom unternehmenskommunikation - die etwas andere Art der Werbe-Dienstleistung
Redpath Deilmann GmbH
moduscom unternehmenskommunikation - die etwas andere Art der Werbe-Dienstleistung
Redpath Deilmann GmbH
FRIEDR. ISCHEBECK GMBH - Schalungs- und Verbausysteme - Formwork and trench shoring systems
Geobrugg AG - Safety is our Nature
Specials
World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering

17. October 2022 (1967 Clicks)

The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.  

read more

Books / Bücher
RAG-Technikchronik - Buch 3: Technikentwicklung in der Vorleistung

RAG-Technikchronik - Buch 3: Technikentwicklung in der Vorleistung

27. September 2018 (13008 Clicks)

Das Buch 3 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Evolution der Vorleistung in den vergangenen 50 Jahren dar. Da sie den Zugang zur Lagerstätte schafft, ist sie die Grundvoraussetzung zur Gewinnung des Rohstoffs Kohle und bildet die Grundlage für den langfristig sicheren und leistungsfähigen Betrieb eines Bergwerks.  

read more

HUESKER Synthetic GmbH
HUESKER Synthetic GmbH
einzigartige Schulungsformate für die Bereiche: Umwelttechnik, Grundbau und Bodenmechanik
HUESKER Synthetic GmbH
einzigartige Schulungsformate für die Bereiche: Umwelttechnik, Grundbau und Bodenmechanik
Fluid Competence GmbH
2nd International Congress - Exhibition - Mining of Uzbekistan and Central Asia (12-13 December 2023, Tashkent, Usbekistan)

Trend News
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine

27.11.2023 (338 Clicks)

Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine


read more - Akobo-Minerals-celebrates-historic-milestone-hitting-gold-ore-body-at-the-Segele-Mine

Trend News
Trend News
GeoResources Journal 3-2023 is online! Special Topic: Focus on fairness and skilled workforce.

03.11.2023 (220 Clicks)

GeoResources Journal 3-2023 is online! Special Topic: Focus on fairness and skilled workforce.


read more - GeoResources-Journal-3-2023-is-online-Special-Topic-Focus-on-fairness-and-skilled-workforce-

Trend News
Anglo American Board Changes - John Heasley new Finance Director

01.11.2023 (170 Clicks)

Anglo American Board Changes - John Heasley new Finance Director


read more - Anglo-American-Board-Changes-John-Heasley-new-Finance-Director