![]() | Market-Place-4.0 Hexagon AB |
11.04.2023
Hexagon launches HxGN MinePlan Block Model Manager to streamline mining block modeling and data management

Hexagon launches HxGN MinePlan Block Model Manager to streamline mining block modeling and data management (Credits: Hexagon)
Hexagon's Mining division, a global leader in mining technology, has unveiled HxGN MinePlan Block Model Manager, a groundbreaking solution that aims to transform how mining companies manage block models. This innovative solution enables users to simultaneously design, populate, manage, and effectively share block models while centrally managing the massive amount of sample points, variables, and outputs associated with orebody data.
A critical component of the mining operations process, block models are a digital representation of the geological and mineralogical features of an ore deposit, allowing mining companies to plan, design and optimize operations. Geologists and mining engineers utilize Hexagon’s MinePlan geosciences and engineering software to populate block model attributes and value, including geology descriptions, grade estimates, cost, data, and schedule information. As technology advancements continue to produce a constant stream of raw resources data from the field, a major challenge with orebody modeling is the direct correlation between data and file size. Effective management is needed to maintain high levels of model accuracy that reflect the unique complexities of each mine and extract valuable insights for effective decision-making.
MinePlan Block Model Manager addresses these challenges while allowing multiple users to collaborate on the same project and share their progress seamlessly while maintaining version integrity and tracking edit history. With this new solution, mining companies can streamline their workflows and improve data interpretation, leading to smart decisions and operational efficiencies.
"The HxGN MinePlan Block Model Manager is a game-changer for the mining industry, empowering users with the ability to manage massive amounts of data and streamline workflows like never before," said Susan Brandt, Vice President of MinePlan at Hexagon’s Mining division. "This truly innovative solution represents a significant win for our clients, as it simplifies the block modeling process and enables greater collaboration and data interoperability. By setting the stage for a unified technology platform, the Block Model Manager will transform the way mining organizations operate and have a profound impact on our users’ productivity, profitability, and overall success."
One of the key benefits of the MinePlan Block Model Manager is the ability for project stakeholders to visualize changes to the model as it progresses through the hands of technical experts. This enhances auditability and information quality, culminating in improved reporting. The block model solution streamlines the data transfer workflow, loading large models faster, improving productivity by reducing time spent from sample point to decision, accelerating the modeling process.
The new Block Model Manager Application Programming Interface (API) automates integration with other systems, enabling data interoperability into downstream mine design and scheduling workflows, removing the need to manually import or export the block model. This is the critical first step towards enabling mining organizations to have a smart platform from one technology partner for software, hardware, and analytics with one consistent experience for implementation, services, and support.
"The MinePlan Block Model Manager is just the beginning of what we hope will be a transformational journey for the mining industry and resource governance overall," said Brandt.
Source: Hexagon







11.04.2023
Skanska builds Solitude tailings buttress in Globe, Arizona, USA
Skanska has signed a contract with mining company BHP Copper Inc., to construct the Solitude buttress main civil works project at the Solitude Closure Tailings site in Globe, Arizona, USA. The total contract value is worth USD 60M, about SEK 630M, which will be included in the US order bookings for the first quarter of 2023.

08.04.2023
Requests for Proposals issued to Teams for Ontario Line in Canada
Infrastructure Ontario (IO) and Metrolinx have issued Requests for Proposals (RFP) for two major works packages for the Ontario Line in Toronto, Canada: Pape Tunnel and Underground Stations and the Elevated Guideway and Stations contracts.

06.04.2023
Just new: GeoResources Journal 1-2023 - Special Topic: Focus on nature and climate
Happy Easter to you all! And if the weather really is as bad as announced, don't worry. We have something for you to read!

03.11.2023
GeoResources Journal 3-2023
Special Topic: Focus on fairness and skilled workforce.
GeoResources Journal 3-2023 is dedicated to the main topic areas of mining, tunnelling, geotechnics and energy, as well as the special topic: Focus on fairness and skilled workforce....
03.11.2023
From first Ideas to Implementation – Satisfaction is guaranteed when we are enthusiastic about what we construct!
Enthusiasm about what we do when we build something is an important key to job satisfaction; communicating this to others, valuing people we deal with, and attracting skilled personnel in future gen...
03.11.2023
Recruiting, Developing and Retaining skilled Workers
As a result of demographic trends and the huge challenge that climate change has brought to society many of the companies involved in the geotechnical engineering, tunnel construction and mineral ex...
12.12.2023 - 13.12.2023
2nd International Congress and Exhibition - Mining of Uzbekistan and Central Asia
14.12.2023 - 15.12.2023
MINING WORLD CONGRESS 2023
14.12.2023 - 15.12.2023
GEOTEC HANOI 2023 – The 5th International Conference on Geotechnics for Sustainable Infrastructure Development
18.12.2023 - 19.12.2023
ICGGE 2023: 17. International Conference on Geotechnical and Geological Engineering

World’s longest Railway Tunnel Project – supported by innovative Conveyor Digitalisation and reliable Engineering
17. October 2022 (2003 Clicks)
The consortium BTC Brennero Tunnel Construction and the Hosch Group jointly delivered on a world-class tunnelling project by combining excellent engineering with the innovative remote monitoring system Hoschiris Discover.


RAG-Technikchronik - Buch 3: Technikentwicklung in der Vorleistung
27. September 2018 (13368 Clicks)
Das Buch 3 der Reihe „Dokumentation der technischen Entwicklung bei der RAG“ stellt die Evolution der Vorleistung in den vergangenen 50 Jahren dar. Da sie den Zugang zur Lagerstätte schafft, ist sie die Grundvoraussetzung zur Gewinnung des Rohstoffs Kohle und bildet die Grundlage für den langfristig sicheren und leistungsfähigen Betrieb eines Bergwerks.


27.11.2023 (562 Clicks)
Akobo Minerals celebrates historic milestone: hitting gold ore body at the Segele Mine


22.11.2023 (165 Clicks)
Start-up Northvolt develops state-of-the-art sodium-ion battery validated at 160 Wh per kg
