Herrenknecht AAOM - Teamwork into the Depth

 

Menu

TPH Bausysteme, sealing, joints, Injection, technology, Concrete, restoration, protection, tunnelling, mining, Abdichtung, Verfuellung, Verfestigen, Sanierung, Tunnelbau, Bergbau

Major Project Reconstruction of the Mine Drainage System for RAG Featured

Pit Franz Haniel 12 in Bottrop, Germany (Source: Thyssen Schachtbau GmbH) Pit Franz Haniel 12 in Bottrop, Germany (Source: Thyssen Schachtbau GmbH)

 

In April 2020, Thyssen Schachtbau GMBH received an order from RAG Aktiengesellschaft to convert the remaining nine mine drainage sites in the Ruhr area and one site in Saarland as part of the mine water concept for the future.


Thyssen Schachtbau prevailed against all competitors in a Europe-wide tender and was thus able to book the largest domestic order in recent decades.

For the work in Saarland, Thyssen Schachtbau relies on a cooperation with Steag Technischer Service GmbH.

The technically, logistically and planning-wise very demanding projects secures work for our miners in the Ruhr area for the next five years.

Source: Thyssen Schachtbau

You can find more information about mine water rebound in GeoResources Journal 4-2020: here

Westermann, S.; Reker, B.; Goerke-Mallet, P,.; Melchers, C. (2020): Mine Water Rebound in a Post-closure ­Environment – Background and practical Experiences. GeoResources Journal (4-2020), pp. 37–42. Online: https://www.georesources.net/download/GeoResources-Journal-4-2020.pdf

back to top

Our Web Adresses

Idea and Programming

Akzeptieren/Accept

Diese Website verwendet nur technisch notwendige Cookies. Sie werden nicht getrackt und Ihre Daten werden nicht weitergeleitet an Dritte. Durch die Nutzung dieser Webseite erklären Sie sich damit einverstanden, dass Cookies gesetzt werden. Mehr erfahren

This website uses only technically necessary cookies. You are not tracked and your data are not passed on to third parties. By using this website, you consent to the use of cookies.