Menu

Fischer Heavy Duty Fixings in the Guiyang Metro Line 1 in China

The Middle Kingdom has been investing intensively in its infrastructure for years. This includes the expansion of the rail network in many cities and in the countryside. The Fischer Group of Companies is providing support to many of these large-scale projects with its fixing systems and on-site service solutions. For example, more than 750,000 Fischer fixings were used during the construction of the new metro line 1 in Guiyang, the capital of Guizhou province in Southwest China. Electrical cables, communication systems, guard doors and firefighting systems were securely and firmly installed using these fixings.

Read more...

Skanska renovates Road Tunnels in Norway

Skanska has signed a contract with the Norwegian Public Roads Administration for the renovation of two tunnels on the E6 in Akershus, Norway. The contract is worth NOK 385M, about SEK 400M, which will be included in the Nordic order bookings for the third quarter 2017.

Read more...

In Case of Emergency - Dartford Crossing in UK

After having suffered a fire in July 2016, a second fire was reported in the Dartford Tunnel in September last year. The fire in a passenger car was detected by the incident detection system, the Fogtec water mist system was activated directly thereafter.

Read more...

Victaulic announces new FireLock Series 745 Fire-Pac Design Improvements

Victaulic, the world's leading manufacturer of mechanical pipe-joining and fire protection systems, introduces improvements to the FireLock® Series 745 Fire-Pac, delivering innovative new options while maintaining the same small Fire-Pac space requirements. The Victaulic Fire-Pac is a pre-assembled fire protection valve and trim that is pre-wired to a fire alarm control panel or junction box and enclosed inside a metal cabinet. The improvements give customers more options and benefits for installation, maintenance and design.

Read more...
Subscribe to this RSS feed

Our Web Adresses

Idea and Programming