Menu

TPH Bausysteme, sealing, joints, Injection, technology, Concrete, restoration, protection, tunnelling, mining, Abdichtung, Verfuellung, Verfestigen, Sanierung, Tunnelbau, Bergbau

Costain Part of Proving Hydrogen can be distributed via existing Gas Networks

Costain, the smart infrastructure solutions company, in collaboration with the gas networks, has produced a feasibility study that will contribute to the ongoing assessments of the ability to use the existing UK gas transmission and distribution networks to transport hydrogen. The project is the first to bring together all the gas distribution networks, working collaboratively to develop an innovative hydrogen solution that could be an answer to decarbonised energy for heat, transport, industry and power generation, helping the UK meets its target to be net zero carbon by 2050.

Read more...

HS2 heralds formal Start of Construction as a 22,000 ‘jobs boost’ for Britain

  • Major milestone for Europe’s largest infrastructure project as it moves from enabling works to full construction following Government’s approval for Notice to Proceed in April
  • HS2 Ltd and its Tier One contractors expect to recruit for around 22,000 roles in the coming years to build the Phase One route – offering people a path back into work after the pandemic
  • HS2 Ltd CEO Mark Thurston: “the reality of high speed journeys joining up Britain’s biggest cities in the North and Midlands and using that connectivity to help level up the country has just moved a step closer”
  • NEW HS2 animations, infographics, drone footage and more available at this link: https://visual.library.hs2.org.uk/p/share/HoMPX6th7pT2
Read more...

Fugro’s ROV Survey and Monitoring Services help install World’s longest Subsea Interconnector

Fugro has completed a contract for Nexans to provide remotely operated vehicle (ROV) survey and monitoring support services to lay the North Sea Link cable through a mountain and along a lakebed in Norway. National Grid NSN Link Ltd and Statnett SF are building an electricity interconnector between Kvilldal in Norway and Blyth in the UK which, on completion, will be the longest subsea interconnector in the world. Fugro’s innovative survey and monitoring solutions supported the installation of two cables through the mountain between Hylsfjorden and Lake Suldalsvatnet, and along the lakebed at a depth of 210 m.

Read more...

First piece of Work undertaken on Network Rail Design Services Framework

Mott MacDonald is undertaking its first piece of work for the new Network Rail Design Services Framework. The project is supporting the development of a new system to support degraded mode working on the railway during signalling system failures. The DMWS project is part of Network Rail’s Research & Development Portfolio – it’s £245M investment programme over CP6 to drive improvements to the safety, performance and efficiency of Britain’s railway infrastructure.

Read more...

RWE chooses State-of-the-Art electrical Transmission System for its 1.4 GW Sofia Offshore Wind Farm

  • World’s number 2 in offshore wind further strengthens its renewables business in the UK
  • GE Renewable Energy’s Grid Solutions and Sembcorp Marine chosen as preferred suppliers for the project’s high voltage direct current transmission system
  • Offshore construction works expected to start in 2023 / More than 50 % of the system components will be manufactured in local UK facilities
Read more...
Subscribe to this RSS feed

Our Web Adresses

Idea and Programming

Akzeptieren/Accept

Diese Website verwendet nur technisch notwendige Cookies. Sie werden nicht getrackt und Ihre Daten werden nicht weitergeleitet an Dritte. Durch die Nutzung dieser Webseite erklären Sie sich damit einverstanden, dass Cookies gesetzt werden. Mehr erfahren

This website uses only technically necessary cookies. You are not tracked and your data are not passed on to third parties. By using this website, you consent to the use of cookies.